ELE20-01473
| Conference | 4/29/2020 | 4/29/2020 | 4/29/2020 2:48:35 PM | P | PASS |
|
|
Screened- video- detached garage Joseph&Alaina Phone #: ###-####... discussed wiring of auxillary building...requirements and inspections...pamphlet given
|
ELE20-01453
| Final | 4/29/2020 | 4/29/2020 | 4/29/2020 1:37:14 PM | P | PASS |
|
|
Idaho Power cannot disconnect until 11 a.m..if you could see me after 3 that would be great Thanks Phone #: ###-#### Inspection requested via web by Eddy Udry... riser replaced...grounding updated...complete...ok to final
|
ELE20-01453
| Permanent Service | 4/27/2020 | 4/29/2020 | 4/29/2020 1:36:09 PM | P | PASS |
|
|
Idaho Power cannot disconnect until 11 a.m..if you could see me after 3 that would be great Thanks Phone #: ###-#### Inspection requested via web by Eddy Udry... p/s o/h reconnect ok
|
ELE20-00695
| Final | 4/28/2020 | 4/29/2020 | 4/29/2020 1:25:09 PM | A | PASS |
|
|
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson...corrections made...ok to final
|
ELE20-01383
| Final | 4/29/2020 | 4/29/2020 | 4/29/2020 1:14:05 PM | P | PASS |
|
|
Screened- Ronald Phone #: ###-####... riser replaced...job complete..ok to final
|
ELE20-01383
| Permanent Service | 4/29/2020 | 4/29/2020 | 4/29/2020 1:13:38 PM | P | PASS |
|
|
Screened- Ronald Phone #: ###-####... p/s reconnect ok
|
ELE20-00750
| Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 11:57:29 AM | P | PASS |
|
|
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...corrected..ok to cover
|
ELE20-01383
| Conference | 4/29/2020 | 4/29/2020 | 4/29/2020 11:24:30 AM | A | PASS |
|
|
service...raising riser for access to backyard...discussed job over phone...going to change to 2" rigid and raise only 30" above roof ...homeowner seems competent
|
ELE19-03639
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 11:00:59 AM | A | PASS |
|
|
first floor drops and heat tape locations in breezeways Phone #: ###-#### Inspection requested via web by Todd Hall...above locations ok to cover
|
ELE19-03961
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 10:55:59 AM | A | PASS |
|
|
2nd floor units (all if possible, or let me know) Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover units and breezeways up to heat tape areas...all floors
|
ELE20-00750
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 9:59:03 AM | A | FAIL |
|
|
ceiling drops bldg 10 Phone #: ###-#### Inspection requested via web by Todd Hall.... 1) NMB/Romex shall be strapped and supported by staples or approved means...334.30 2)NMB/romex shall be protected a minimum 1/4" from face of material...taping to T channel not acceptable means
|
ELE19-04924
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 8:46:44 AM | A | PASS |
|
|
Wall rough in Phase 5. Phone #: ###-#### Inspection requested via web by David Feller... walls ok to cover...8 outlets and switching for new rm...storage rm for material of next phases
|
ELE19-02894
| Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 7:47:54 AM | A | PASS |
|
|
rough inspection...inspection done by emailed images as per COVID19 requirements...conference had been given and discussed requirements of wiring of areas...ok to cover
|
ELE19-04173
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 12:00:00 AM | A | FAIL |
|
|
ceiling drops bldg 10 Phone #: ###-#### Inspection requested via web by Todd Hall.... 1) NMB/Romex shall be strapped and supported by staples or approved means...334.30 2)NMB/romex shall be protected a minimum 1/4" from face of material...taping to T channel not acceptable means
|
ELE19-04173
| Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 12:00:00 AM | A | PASS |
|
|
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...corrected..ok to cover
|
ELE19-02894
| Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/28/2020 12:31:24 PM | P | CANC |
|
|
ok with video/photo // larry Phone #: ###-####...check for email to review rough
|