ELE19-00742
| Final | 4/5/2019 | 4/5/2019 | 4/5/2019 2:18:28 PM | P | PASS |
|
|
Please call 20 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Mike Leonard.... ok to final
|
ELE18-02459
| Final | 4/5/2019 | 4/5/2019 | 4/5/2019 2:07:17 PM | P | PASS |
|
|
Mucho Phone #: ###-####... ok to final
|
ELE19-00990
| Final | 4/4/2019 | 4/5/2019 | 4/5/2019 1:00:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kenneth Rhode...ok to final
|
ELE19-01210
| Final | 4/5/2019 | 4/5/2019 | 4/5/2019 11:53:00 AM | P | FAIL |
|
|
House is vacant and is for sale-lockbox code is 5260 on front door Phone #: ###-#### Inspection requested via web by Same Electric... 1) outlet and light needed at attic fan location..210.70(C) 2) all openings in panels/load centers shall be closed...no code violation shall be retained...furnace load center needs a blank 3) clearances for main panel need addressed...3ft in front and 30" side...cabinet needs addressed around panel
|
ELE16-02662
| ELE-Aging Inspection | 3/29/2019 | 4/5/2019 | 4/5/2019 11:05:56 AM | A | FAIL |
|
|
contact homeowner to get access... correction notice posted...requiring action within 30 days
|
ELE18-01889
| Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 10:40:19 AM | A | PASS |
|
|
wall rough in west building Phone #: ###-#### Inspection requested via web by Debby Pierce...all walls ok to cover
|
ELE18-02523
| Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 10:39:04 AM | A | PASS |
|
|
2nd. floor hard lid inspection Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to cover
|
ELE18-04192
| Final | 4/3/2019 | 4/5/2019 | 4/5/2019 9:58:44 AM | A | PASS |
|
|
electrician phone # ###-#### Phone #: ###-#### Inspection requested via web by Matthew White...corrections made ok to final
|
ELE19-01200
| Electrical Rough-In | 4/4/2019 | 4/5/2019 | 4/5/2019 9:33:15 AM | A | PASS |
|
|
Call Matt on site if any questions, ###-#### Phone #: ###-#### Inspection requested via web by Bryan Atkins... wall cover and hard lid locations ok to cover
|
ELE19-01200
| Permanent Service | 4/5/2019 | 4/5/2019 | 4/5/2019 9:31:59 AM | A | PASS |
|
|
Call Matt on site if any questions, ###-#### Phone #: ###-#### Inspection requested via web by Bryan Atkins... p/s u/g new ok...meter pack east side of building
|
ELE19-00673
| Final | 4/4/2019 | 4/5/2019 | 4/5/2019 8:51:50 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by David Baker... 1) junction box shall be rated for exterior use...weather proof box...110.3 2)junction boxes shall have a cover...314.28(C)
|
ELE17-00694
| ELE-Aging Inspection | 4/5/2019 | 4/5/2019 | 4/5/2019 7:24:57 AM | | PASS |
|
|
still under construction
|