ELE19-00879
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 2:28:22 PM | P | PASS |
|
|
Please call when you are on your way to the site. Phone #: ###-#### Inspection requested via web by Spencer McLean... disconnect with GFCI breakers...ok to final
|
ELE19-00879
| Permanent Service | 6/18/2019 | 6/19/2019 | 6/19/2019 2:27:48 PM | P | PASS |
|
|
Please call when you are on your way to the site. Phone #: ###-#### Inspection requested via web by Spencer McLean... ok to connect
|
ELE16-03043
| ELE-Aging Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 2:03:09 PM | | FAIL |
|
|
contractor making no attempt to schedule required inspection
|
ELE19-02241
| Electrical Rough-In | 6/19/2019 | 6/19/2019 | 6/19/2019 1:32:31 PM | P | PASS |
|
|
Call son for access // Paul Jesse ###-#### electrican Phone #: ###-####... wiring ok to cover
|
ELE19-02220
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 1:02:16 PM | P | PASS |
|
|
Bonding and underground cover. Owner will be home, use east gate to backyard. Phone #: ###-#### Inspection requested via web by Kevin Koomler.... underground ok to cover-light, cover, outlet, and switching bonding-4 corners, light, and cover
|
ELE19-01858
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 12:45:39 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... ceiling grid not yet complete ...LV not done...will need recalled in when complete...electrical contractor not doing work but grid inspection their responsibility
|
ELE19-01965
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 11:18:17 AM | A | FAIL |
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes...
Boise City requires a rough inspection before a final inspection can be requested this is not contractors first job in Boise City and is fully aware of requirement materials on roof will be removed and placed on ground for rough inspection...tiles, inverters, etc. a reinspection fee will be applied to permit and needs paid before future inspections scheduled
|
ELE19-01498
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 10:11:23 AM | A | NR |
|
|
please call Nick Phone #: ###-#### Inspection requested via web by Kevin Perez... not ready at this time...needed grid inspection only
|
ELE19-01498
| Electrical Rough-In | 6/19/2019 | 6/19/2019 | 6/19/2019 10:10:31 AM | A | PASS |
|
|
please call Nick Phone #: ###-#### Inspection requested via web by Kevin Perez... grid inspection...ok to cover
|
ELE19-02256
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 9:46:17 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes... up sized fuses and new labelling...ok to final
|
ELE19-02256
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 9:44:35 AM | A | PASS |
|
|
This is a 3 panel addition to an existing system so will most likely be done by 10:30/11am. Give a call prior if needed and I can make sure someone is there to meet you. Thank you! Phone #: ###-#### Inspection requested via web by Rob Maes... 3 panels verified
|
ELE19-01997
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 9:17:11 AM | A | PASS |
|
|
Please call the number above before heading to the jobsite. Phone #: ###-#### Inspection requested via web by BRS Permitting... UL listed equipment 20A breaker in panel...no access needed for final
|
ELE19-02206
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 8:53:44 AM | A | PASS |
|
|
Available anytime after 7:30.
If no answer at door (Doorbell hard to hear from construction location) call ###-####. Phone #: ###-#### Inspection requested via web by Kirt Palmer.... ok to cover wall for new switch location and floor heat controller
|
ELE19-02167
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 7:45:46 AM | A | PASS |
|
|
Please call prior to arrival Phone #: ###-#### Inspection requested via web by Patrick Paz...inspection done previous day...see notes
|