ELE18-02698
| Final | 7/5/2019 | 7/5/2019 | 7/5/2019 11:50:51 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ELIZABETH BURLO...ok to final
|
ELE19-02477
| Electrical Rough-In | 7/2/2019 | 7/5/2019 | 7/5/2019 10:50:59 AM | A | PASS |
|
|
Please call Lynn prior to arrival Phone #: ###-#### Inspection requested via web by Lynn Proctor... main walls and new interior walls ok to cover
|
ELE19-01969
| Electrical Rough-In | 7/3/2019 | 7/5/2019 | 7/5/2019 10:07:01 AM | A | CANC |
|
|
We need a ceiling cover. Bob is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker...no access...Bob said should of been called in for Monday
|
ELE19-01763
| Permanent Service | 7/5/2019 | 7/5/2019 | 7/5/2019 9:48:15 AM | P | PASS |
|
|
Fault current is now posted on meter base Phone #: ###-#### Inspection requested via web by TOM BICANDI...inspected 6/27/19...see notes
|
ELE19-01295
| Final | 7/3/2019 | 7/5/2019 | 7/5/2019 9:46:35 AM | A | FAIL |
|
|
access: 4141 Phone #: ###-#### Inspection requested via web by David Nelson... 1) replace damaged A/C disconnect...arcing inside disconnect 2) L/O needs installed on correct breaker..(micro)
|
ELE19-01123
| Final | 7/3/2019 | 7/5/2019 | 7/5/2019 9:07:39 AM | A | PASS |
|
|
Patrick is the contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker...ok to final
|
ELE18-02136
| ELE-Aging Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 7:17:02 AM | A | FAIL |
|
|
contractor needs to schedule final inspection roof top units have never been inspected...access needed and contractor pressent for inspection
|
ELE17-00694
| ELE-Aging Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 7:15:00 AM | | DONE |
|
|
still under construction
|
ELE19-01455
| Electrical Rough-In | 7/2/2019 | 7/5/2019 | 7/2/2019 3:07:54 PM | A | CANC |
|
|
We have left plans in the meter box for final inspection Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
|