ELE19-02845
| Rough-In Permanent Service | 8/1/2019 | 8/1/2019 | 8/1/2019 2:15:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman... rough ok to cover p/s u/g new ok
|
ELE18-03646
| Electrical Rough-In | 8/1/2019 | 8/1/2019 | 8/1/2019 2:13:57 PM | P | PASS |
|
|
Leon- underground cover inspction Phone #: ###-####... pipe feeding pool panel was not inspected at time of installation and neither GC or Electrical contractor will admit to work depth and length of pipe feeding pool verified be string...190ft unable to verify how pipe was run to pool panel to get true depth...over 70% of pipe is under driveway GC and electrical contractor taking full responsibility for circuit wiring to pool
|
ELE19-02421
| Final | 8/1/2019 | 8/1/2019 | 8/1/2019 1:23:38 PM | P | PASS |
|
|
Rod Phone #: ###-####..ok to final
|
ELE19-02643
| Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 12:18:32 PM | P | PASS |
|
|
electrical is done except for auto cover. Call ###-#### with any Questions Phone #: ###-#### Inspection requested via web by mark hood... underground ok to cover EQ grid ring ok with corners and stubs for automatic cover
pool subpanel needs proper labelling and auto pool cover complete before final
|
ELE19-01164
| Final | 7/31/2019 | 8/1/2019 | 8/1/2019 10:51:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle...unable to verify disconnect for sign installed and working...panel non-accessible...business open...ok to final
|
ELE19-00218
| Final | 7/31/2019 | 8/1/2019 | 8/1/2019 10:50:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle...unable to verify disconnect for sign installed and working...panel non-accessible...business open...ok to final
|
ELE19-02701
| Final | 8/1/2019 | 8/1/2019 | 8/1/2019 10:30:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins...ok to final
|
ELE19-01002
| Final | 7/31/2019 | 8/1/2019 | 8/1/2019 9:51:32 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle...ok to final
|
ELE19-02859
| Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 9:40:54 AM | A | PASS |
|
|
Ground works inspection ONLY Phone #: ###-#### Inspection requested via web by Eric Schroeder...ok to cover
|
ELE18-01889
| Electrical Rough-In | 8/1/2019 | 8/1/2019 | 8/1/2019 9:21:14 AM | P | CANC |
|
|
gym Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
|
ELE19-02521
| Final | 7/31/2019 | 8/1/2019 | 8/1/2019 9:18:02 AM | A | PASS |
|
|
Contact Josh Slater Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek...ok to final
|
ELE19-02862
| Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 8:43:26 AM | A | PASS |
|
|
Soffits south 24 plex Phone #: ###-#### Inspection requested via web by Kevin Burke... first half ok to cover
|
ELE19-02852
| Conference | 7/31/2019 | 8/1/2019 | 8/1/2019 8:10:27 AM | A | CANC |
|
|
Terry Phone #: ###-####... outside city limits...state permit needed perm tech fixing and homeowner made aware of
|