ELE20-02862
| Electrical Rough-In | 8/12/2020 | 8/12/2020 | 8/12/2020 2:17:15 PM | P | PASS |
|
|
Matt Garcia is the onsite contact 1-###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez...new walls/open walls...bathrooms, training rm, 112, 113 ,206...ok to cover
|
ELE20-02157
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 1:53:00 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe....
1) circuits shall be free of shorts and faults 2) bedrooms shall have required AFCI protection
|
ELE20-02158
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 1:51:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe...correction made...ok to final
|
ELE20-02073
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 1:51:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe.... corrections made...ok to final
|
ELE20-02077
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 1:51:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe...ok to final
|
ELE20-02275
| Permanent Service | 8/12/2020 | 8/12/2020 | 8/12/2020 12:51:40 PM | P | PASS |
|
|
The disconnect at the crosswalk on Five Mile just south of Granger is ready for inspection. Please call Joe with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean...
ground required added...p/s u/g new ok
|
ELE20-02820
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 12:07:34 PM | A | PASS |
|
|
bedroom extension and added closet and rear entry Phone #: ###-#### Inspection requested via web by David McClellan...rough ok to cover
|
ELE20-02856
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 11:21:28 AM | A | NR |
|
|
Please call Dakota @ ###-#### with any questions. 3 outlets ,20 amp dedicated circuit for office and above fire place,dedicated circuit for both bed rooms and nook area Extend garage circuit to back bedroom. Phone #: ###-#### Inspection requested via web by keri Carter... not complete...will reschedule when done...talked to Dakota about work...occupied home
|
ELE20-01348
| Final | 8/10/2020 | 8/12/2020 | 8/12/2020 11:09:47 AM | A | PASS |
|
|
Screened- Jen Phone #: ###-####... labelling, disconnect, OCPD, and panel change complete...ok to final
|
ELE20-01531
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 10:56:10 AM | A | PASS |
|
|
dryer outlet and water heater. Door is in back of building. Hours 9:00 to 6:00. Unique Blinds. Phone #: ###-#### Inspection requested via web by PAT MILLER... circuits fed thru drop ceiling...labelled in panel...complete...ok to final
|
ELE20-02854
| Conference | 8/11/2020 | 8/12/2020 | 8/12/2020 10:43:41 AM | A | PASS |
|
|
call ahead Kevin */Requesting virtual inspection*/ Phone #: ###-####.... discussed wire size, location of generrator distribution, wiring methods and grounding...homeowner competent in doing work
|
ELE20-02710
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:33:11 AM | A | PASS |
|
|
Devon Lewno is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... UL listed material and plans on sight access to backyard and panel in garage required for final
|
ELE20-02627
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/12/2020 9:21:18 AM | A | PASS |
|
|
There will be someone home. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan.. ok to cover
|
ELE20-02858
| Final | 8/11/2020 | 8/12/2020 | 8/12/2020 9:04:50 AM | A | PASS |
|
|
need to get a final for gas furnace and A/C connections. Justin is our contact. Job is a little crowded with gas installer and HVAC crew so will have Justin contact inspector to see how best to proceed. Thank you! Phone #: ###-#### Inspection requested via web by Kelly Felin...
occupied home inspection done per COVID19 and Boise city restrictions..images sent scope of work was furnace and A/C only
|
ELE20-02515
| Rough-In Permanent Service | 8/11/2020 | 8/12/2020 | 8/12/2020 8:42:54 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins...scheduled twice
|
ELE20-02515
| Permanent Service | 8/11/2020 | 8/12/2020 | 8/12/2020 8:42:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins...
p/s u/g new ok...2 meters need for 2 panels in space
|
ELE20-02409
| Final | 8/12/2020 | 8/12/2020 | 8/12/2020 8:09:15 AM | A | PASS |
|
|
access through gate at left of garage, inspection can be done anytime am or pm if needed. Phone #: ###-#### Inspection requested via web by steve sellers...job complete..GFCI protection and disconnect...ok to final
|
ELE20-02160
| Final | 8/11/2020 | 8/12/2020 | 8/11/2020 4:20:06 PM | A | CANC |
|
|
Please call before inspection. Phone #: ###-#### >> Inspection requested via web by Matt Oranday Inspection cancelled from web by: Matt Oranday
|
ELE20-02710
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/11/2020 3:00:38 PM | P | CANC |
|
|
Devon Lewno is the onsite contact - ###-#### Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|
ELE20-02710
| Electrical Rough-In | 8/11/2020 | 8/12/2020 | 8/11/2020 2:56:56 PM | A | CANC |
|
|
Devon Lewno will be the onsite contact - ###-#### Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|