ELE17-02879
| ELE-Aging Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 3:41:41 PM | | FAIL |
|
|
contractor needs to schedule final or update on progress of job
|
ELE19-03115
| Permanent Service | 8/20/2019 | 8/20/2019 | 8/20/2019 3:40:02 PM | P | NR |
|
|
Street Lighting Pedestal Phone #: ###-#### Inspection requested via web by Kevin Burke... missing parts...rescheduled to next day
|
ELE19-03104
| Electrical Rough-In | 8/19/2019 | 8/20/2019 | 8/20/2019 3:26:19 PM | P | PASS |
|
|
Please call Luke before arrival. Phone #: ###-#### Inspection requested via web by Kevin Perez.... ok to cover...new kitchen layout and mst bath layout...existing circuits used excluding cover for fireplaces x 2...need rough inspection once installed
|
ELE19-02372
| Final | 8/19/2019 | 8/20/2019 | 8/20/2019 1:51:49 PM | P | PASS |
|
|
verify breaker labelling and fuse size for charging stations...Rob ###-####.... fuses reduced to MOP nameplate and breakers labelled...ok to final
|
ELE19-00030
| Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 1:17:49 PM | P | PASS |
|
|
Rough-in inspection for the southeast corner of showroom and mezzanine. Wade Luthy, lead journeyman on-site, ###-#### Phone #: ###-#### Inspection requested via web by Bryan Atkins.... front floor deck showrm SE corner furniture pwr mezzanine breakroom/kitchen area and room walls and hardlid...ok to cover
|
ELE17-02916
| ELE-Aging Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 1:00:59 PM | | FAIL |
|
|
contractor making no attempt scheduling required inspections
|
ELE19-02542
| Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 12:47:24 PM | P | PASS |
|
|
Underground conduits for parking lot. Phone #: ###-#### Inspection requested via web by Dan Cox....ok to cover
|
ELE19-03099
| Electrical Rough-In | 8/19/2019 | 8/20/2019 | 8/20/2019 12:22:38 PM | P | PASS |
|
|
Access around back. I should be there. No dogs. Phone #: ###-#### Inspection requested via web by Craig Korell... rough ok to cover
|
ELE19-03118
| Final | 8/20/2019 | 8/20/2019 | 8/20/2019 11:33:30 AM | P | PASS |
|
|
not sure what type of inspection is needed here. Intermountain Gas, fixed network install. Mike Pugh is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...no fututre inspection needed...unmetered and no access do to height of disconnect on pole
|
ELE19-03118
| Permanent Service | 8/20/2019 | 8/20/2019 | 8/20/2019 11:32:18 AM | P | PASS |
|
|
not sure what type of inspection is needed here. Intermountain Gas, fixed network install. Mike Pugh is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce.... unmetered service with disconnect....disconnect located 20ft up on pole...#6 solid ground to ground rod...rigid conduit with weather head...unable to verify anything else without access up pole p/s new ok
|
ELE18-01889
| Electrical Rough-In | 8/20/2019 | 8/20/2019 | 8/20/2019 10:55:26 AM | A | PASS |
|
|
roof top units.... 6 units...4 units ok 2 units...panel H1A breaker space 246 and 135 need downsized to 70A....check at future inspection
|
ELE18-02523
| Electrical Rough-In | 8/19/2019 | 8/20/2019 | 8/20/2019 10:50:09 AM | A | PASS |
|
|
roof Phone #: ###-#### Inspection requested via web by Debby Pierce.... 3 mini split units need fuses down sized to 20A...check future inspection
|
ELE19-02993
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:21:18 AM | A | PASS |
|
|
This request is also for the house meter for the whole building for outside lights and outside outlets. Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough in ok to cover house service will be removed off building and done by other means so only one service drop per building p/s u/g new ok
|
ELE19-02992
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:18:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough in ok to cover p/s u/g new ok
|
ELE19-02991
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:18:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough in ok to cover p/s u/g new ok
|
ELE19-02990
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:17:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough in ok to cover p/s u/g new ok
|
ELE19-02989
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:17:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|
ELE19-02988
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:16:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|
ELE19-02986
| Rough-In Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:15:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|
ELE19-01316
| Permanent Service | 8/19/2019 | 8/20/2019 | 8/20/2019 10:08:32 AM | P | CANC |
|
|
Permanent service for streets light pedestal. Phone #: ###-#### Inspection requested via web by Kevin Burke....needed to pull new permit for work...contractor notified
|
ELE19-01316
| Final | 8/19/2019 | 8/20/2019 | 8/20/2019 10:05:02 AM | A | PASS |
|
|
exterior final...complete final for building ok
|
ELE19-03073
| Final | 8/16/2019 | 8/20/2019 | 8/19/2019 10:51:54 PM | A | CANC |
|
|
Please contact Barry Spencer with any questions or timeline. ###-#### Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|