ELE18-02471
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 2:55:25 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot...ok
|
ELE18-02477
| Electrical Rough-In | 8/8/2018 | 8/8/2018 | 8/8/2018 2:27:36 PM | P | PASS |
|
|
Yolanda-please call prior to meet Phone #: ###-####...rough ok...sch40 in garage will be changed to sch80 exposed...at shed pipes that were heated up and bent will be replaced by final
|
ELE18-02300
| Electrical Rough-In | 8/8/2018 | 8/8/2018 | 8/8/2018 1:24:19 PM | P | PASS |
|
|
Underground stub-ups at panel at northwest corner of the new slab area. Rock inspected/took pictures of conduits close, we just needed to glue on 90''s and nipples to get to above slab. Phone #: ###-#### Inspection requested via web by Jason Parke...underslab complete...ok to cover
|
ELE18-00335
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 12:51:46 PM | P | PASS |
|
|
final to close permit...rough in only...work taken over by other contractor under permit ELE18-02986
|
ELE18-02986
| Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 12:48:15 PM | A | PASS |
|
|
Kelly Phone #: ###-####-inspection rough in only for master bath-see job description...ok to cover master bath and new circuit for micro and ceiling fan...contractor is agreeing to take over work of other contractor permit ELE18-00335...refer to rough in on this permit...not all walls were opened and required outlets were added for code
|
ELE18-00183
| Final | 8/7/2018 | 8/8/2018 | 8/8/2018 11:47:17 AM | A | FAIL |
|
|
entrance code 5151 enter Phone #: ###-#### Inspection requested via web by ron spen cer...
1..OCPD on oven is too large-manufacturers rating... 2..can trim in powder bath shower not damp location rated 3..outlets within 6ft of sink shall have GFCI protection-utillity rm
|
ELE18-02631
| Electrical Rough-In | 8/6/2018 | 8/8/2018 | 8/8/2018 11:10:53 AM | A | FAIL |
|
|
Brian Prussia, tech: ###-####
Phone #: ###-#### Inspection requested via web by BRS Permitting...job complete...no one here working...unable to inspect...contractor been told multiple times how scheduling works with Boise City...made contact with scheduler of inspections in Utah once again...final scheduled for next day...will require reprenstative on site and panels removed and ladder for access
|
ELE18-02160
| Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 10:42:38 AM | A | CANC |
|
|
Winfred Phone #: ###-####...needed to be converted to another conference...pamphlet given again
|
ELE18-02160
| Conference | 8/8/2018 | 8/8/2018 | 8/8/2018 10:41:53 AM | A | PASS |
|
|
Winfred Phone #: ###-####...discussed wiring of new addition... pamphlet given again..went over required fixes bath circuit, bath tub, make up, wrong wire for circuits, panel requirement...etc.
|
ELE18-02829
| Electrical Rough-In | 8/7/2018 | 8/8/2018 | 8/8/2018 9:23:18 AM | A | PASS |
|
|
Taylor Barton, crew lead: ###-####" Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listing verified...40A breaker in panel
|
ELE18-02879
| Final | 8/7/2018 | 8/8/2018 | 8/8/2018 8:36:36 AM | A | PASS |
|
|
We are requesting a final inspection for this project for tomorrow morning. Our contact is Jimmy at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate...removal of electrical in wall where wall is being removed...no access to area but discussed with general contractor Jim Thompson and electrical contractor about worked performed...circuits removed back to junction boxes and caped off...ok to final
|
ELE18-02253
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 8:33:40 AM | A | PASS |
|
|
final for new locker room bathroom...ok to final
|