ELE16-02973
| ELE-Aging Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 3:24:16 PM | | FAIL |
|
|
contractor has been made aware of and making no attempt
|
ELE19-03286
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 3:21:11 PM | P | PASS |
|
|
Please call Rocky one hour before inspection so he can meet the inspector there. Thanks! Phone #: ###-#### Inspection requested via web by Sarah Schuller...UL listed equipment
|
ELE19-03478
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 2:50:12 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Noah Giver...ok to cover
|
ELE19-03494
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 2:49:49 PM | P | PASS |
|
|
Walls Phone #: ###-#### Inspection requested via web by Garrett Collins... new walls for offices and bathrooms ok to cover...discussed panel location in stairwell..will be relocated and requirements for non dwelling unit
|
ELE19-01489
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/17/2019 1:55:02 PM | P | PASS |
|
|
Wall cover in area A. Toby is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen....walls ok to cover...areas marked and dated on plans
|
ELE19-02085
| Electrical Rough-In | 9/17/2019 | 9/17/2019 | 9/17/2019 1:16:49 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ceiling grid ok to cover
|
ELE19-03504
| Rough-In Permanent Service | 9/17/2019 | 9/17/2019 | 9/17/2019 12:39:07 PM | P | FAIL |
|
|
The AFC label will be installed when we get the report from Idaho Power. Phone #: ###-#### Inspection requested via web by Jeremiah Mitchell.... AFC label is required to be posted before meter can be energized
|
ELE19-01848
| Final | 9/17/2019 | 9/17/2019 | 9/17/2019 11:12:40 AM | P | PASS |
|
|
Final Inspection Store-it gate code is *053017# Lock code for the cell site is 2019 Main service is in the back of the building on the freeway side. Contact Josh Slater Thank you
Phone #: ###-#### Inspection requested via web by Cathy Duchek..ok to final
|
ELE19-00929
| ELE-Request for Extension | 9/16/2019 | 9/17/2019 | 9/17/2019 10:50:25 AM | A | PASS |
|
|
Nathan Phone #: ###-####... permit extended...still under construction...spoke with homeowner and verbally went over future inspections and requirements
|
ELE19-03024
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 10:39:38 AM | A | PASS |
|
|
Call ahead // Mike Phone #: ###-####... shunt trip integrated with elevator surface wiring done by manufacturer pit wiring previously inspected on electrical contractorspermit ok to final
|
ELE19-03508
| Temporary Service | 9/17/2019 | 9/17/2019 | 9/17/2019 9:45:23 AM | P | PASS |
|
|
Temp pole Phone #: ###-#### Inspection requested via web by Jay VanSchoiack... t/s o/h new ok
|
ELE19-02464
| Permanent Service | 9/17/2019 | 9/17/2019 | 9/17/2019 9:08:52 AM | A | PASS |
|
|
Tom You Wont Believe This But The excavator Hit This Again! Im Fixiing This Morning And Need To Restore Power To Occupied House If We Need New Permit Let Me Know And Ill Pull It And Final Borth At Once Thanks Dave Should Be Done By 900 Phone #: ###-#### Inspection requested via web by jason shifflett... meter replaced because of damage p/s u/g reconnect ok
|
ELE19-02513
| Permanent Service | 9/16/2019 | 9/17/2019 | 9/17/2019 8:56:27 AM | A | PASS |
|
|
Incoming water line is plastic, ground rods driven outside. Phone #: ###-#### Inspection requested via web by Troy Cobb... p/s o/h ok to connect to new location/meter-main
|
ELE19-03051
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 8:46:22 AM | A | PASS |
|
|
Call for access Phone #: ###-#### Inspection requested via web by BARRY KENDALL...ok to final
|
ELE19-03419
| Final | 9/16/2019 | 9/17/2019 | 9/17/2019 8:18:26 AM | A | PASS |
|
|
100 amp service change Final. Key is on top of outdoor panel. Phone #: ###-#### Inspection requested via web by Douglas Hackney...ok to final
|
ELE19-03286
| Electrical Rough-In | 9/16/2019 | 9/17/2019 | 9/16/2019 9:22:07 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sarah Schuller Inspection cancelled from web by: Sarah Schuller
|
ELE19-02038
| Final | 9/16/2019 | 9/17/2019 | 9/16/2019 3:33:44 PM | A | CANC |
|
|
Home is occupied. Please call Mark (homeowner) 10 minutes before arrival at ###-#### Phone #: ###-#### >> Inspection requested via web by Dean Gernaat Inspection cancelled from web by: Dean Gernaat
|