ELE17-02234
| ELE-Aging Inspection | 9/19/2019 | 9/19/2019 | 9/25/2019 7:21:22 AM | | CANC |
|
|
too busy
|
ELE19-02913
| Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 2:45:22 PM | P | PASS |
|
|
After 12:30 is best. Phone #: ###-#### Inspection requested via web by Kurtis Stark...rough complete...full cover ok
|
ELE19-03549
| Final | 9/19/2019 | 9/19/2019 | 9/19/2019 2:26:41 PM | P | PASS |
|
|
Randy-elevator Phone #: ###-####... job complete...ok to final
|
ELE19-03549
| Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 2:26:13 PM | P | PASS |
|
|
Randy-elevator Phone #: ###-####... surface wiring...emt, flex, metal boxes...complete
|
ELE19-03219
| Final | 9/19/2019 | 9/19/2019 | 9/19/2019 1:22:13 PM | P | PASS |
|
|
On previous inspection, inspector requested electrician to be present at time of final inspection. PLEASE CONTACT MATT (electrician) 1 HR PRIOR TO ARRIVAL SO HE CAN BE PRESENT. He will be servicing other jobs until he receives notification of arrival time. ###-#### Phone #: ###-#### Inspection requested via web by Same Electric.. job complete...hot tub installed...grounding fixed...ok to final
|
ELE19-02038
| Final | 9/18/2019 | 9/19/2019 | 9/19/2019 12:52:23 PM | P | PASS |
|
|
Home is occupied. Please call Mark (homeowner) 10 minutes before arrival at ###-#### Phone #: ###-#### Inspection requested via web by Dean Gernaat...ok to final...home occupied so final checkout was done on outlets and areas that were accessible...contractor shall take full responsibility of work
|
ELE19-02836
| Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 12:03:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears...correction made...ok to cover
|
ELE19-03476
| Electrical Rough-In | 9/19/2019 | 9/19/2019 | 9/19/2019 11:55:04 AM | P | PASS |
|
|
Need under ground to floor box inspected Phone #: ###-#### Inspection requested via web by Brad Girard.... ok to cover floor box and new reception pony wall with 2 outlets
|
ELE19-03042
| Electrical Rough-In | 9/18/2019 | 9/19/2019 | 9/19/2019 11:36:54 AM | A | PASS |
|
|
Dennis Phone #: ###-####... homeowner was an electrical contractor no need for conference rough in ok to cover...6 cans 2 paddle fans
|
ELE19-03548
| Temporary Service | 9/19/2019 | 9/19/2019 | 9/19/2019 11:10:17 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey...t/s u/g n ok
|
ELE19-03319
| Final | 9/18/2019 | 9/19/2019 | 9/19/2019 10:44:52 AM | A | PASS |
|
|
MAIN CONTACT: Brian Prussia: ###-#### On-Site Contact - Mierins Rozentals: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... labelling, disconnect, and OCPD ok
|
ELE19-03374
| Permanent Service | 9/18/2019 | 9/19/2019 | 9/19/2019 10:22:15 AM | A | PASS |
|
|
moved and upgraded o.h. service from 100 amp to 200 amp. new service location is on back wall of new garage. turned existing service located on back of original house into a 100 amp sub panel. a.m inspection is best as the owner is busy in afternoon. no dogs present. owners name is cory and can direct inspection, thanks ron ormerod. Phone #: ###-#### Inspection requested via web by ron ormerod... LV intersystem bond needs added SLB at old meter location needs addressed p/s o/h relocation ok
|
ELE19-00789
| Final | 9/17/2019 | 9/19/2019 | 9/19/2019 9:32:56 AM | A | NR |
|
|
Module building.Relocated service from over head to underground. Phone #: ###-#### Inspection requested via web by Deb Ipsen...not complete
|
ELE19-00895
| Electrical Rough-In | 9/17/2019 | 9/19/2019 | 9/19/2019 9:32:12 AM | A | PASS |
|
|
Ceiling rough in... Shannon is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen...ok to cover
|
ELE17-03273
| ELE-Aging Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 8:13:57 AM | | FAIL |
|
|
contractor making no attempt to correct corrections and schedule inspections violation notice was posted and being ignored
|