PLM19-01705
| Plumbing Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 12:06:40 PM | A | FAIL |
|
|
Renato Albanese site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical. Three (3) gas pressure tests failed.
Water and fd vent ok.
|
PLM19-01821
| Final | 6/11/2019 | 6/12/2019 | 6/12/2019 10:42:27 AM | A | PART |
|
|
Josh Phone #: ###-#### The backflow must be certified by a certified backflow tester. OK to cover
|
PLM19-01838
| Plumbing Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 10:27:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM19-02292
| Water Heater Final | 6/6/2019 | 6/12/2019 | 6/12/2019 9:54:45 AM | A | PASS |
|
|
PLEASE CALL WHEN ON THE WAY Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM19-02365
| Sprinkler (Final) | 6/11/2019 | 6/12/2019 | 6/12/2019 9:35:21 AM | A | PASS |
|
|
NorthEast Corner-Ryan Phone #: ###-####
|
PLM18-00759
| Water Heater Final | 6/6/2019 | 6/12/2019 | 6/12/2019 9:18:25 AM | A | NH |
|
|
Water Heater re-inspection Phone #: ###-#### Inspection requested via web by Erin Whiting
|
PLM19-00910
| Final | 6/11/2019 | 6/12/2019 | 6/12/2019 9:01:34 AM | A | FAIL |
|
|
Door lock box 188 (located on the ground) Phone #: ###-#### Inspection requested via web by Tom Maxwell 1. Paint pvc vents 2. hard pipe t&p on the water heater. life/safety 3. only one slip joint allowed on the outlet side of a trap
|