PLM20-02616
| Water Heater Final | 6/25/2020 | 6/25/2020 | 6/25/2020 12:47:03 PM | P | PASS |
|
|
CALL WHEN ON WAY ###-#### Phone #: ###-#### Inspection requested via web by Kelli Morgan
|
PLM20-02583
| Plumbing Rough-in | 6/25/2020 | 6/25/2020 | 6/25/2020 12:21:54 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Lance Manning 1. DWV test failed. 2. Strap DWV at 4ft and end of line/trap arms. 3. Grade all waste at 1/4 ft. 4. Install full size cleanouts w/in 5ft of crawl or above floor.
|
PLM20-01445
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 11:48:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lance Manning
|
PLM20-00697
| Final | 6/24/2020 | 6/25/2020 | 6/25/2020 11:15:34 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes The double check to the fire sprinkler system needs to be certified
|