Inspections for the day of: Friday, June 5, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM20-01663 Final6/5/20206/5/20206/5/2020 3:49:33 PMPFAIL
FINAL INSPECTION Phone #: ###-#### Inspection requested via web by Kelli Morgan
1. Install a tempering valve on the public lav.
2. Certify the premise protection DC
3. The expansion tank is defective.
PLM20-00898 Plumbing Rough-in6/5/20206/5/20206/5/2020 3:28:55 PMPFAIL
Carl Phone #: ###-####
1. Verify all overhead drain grade.
2. Use sanitary tees on all trap arms.
3. Upstairs wc is wet vented with the shower.
4. US bath lav is not vented.
5. Vent kitchen sink.
6. Install base of stack cleanout at the garage riser.
Did not crawl the crawlspace. Walked home with the homeowner to explain.
PLM20-02327 Plumbing Rough-in6/5/20206/5/20206/5/2020 2:25:29 PMPPASS
Site Contact - Renato Albanese Phone #: ###-#### Inspection requested via web by RM Mechanical
PLM20-02185 Sprinkler (Final)6/4/20206/5/20206/5/2020 2:07:39 PMPPASS
PVB back flow located next to fence off Contractor Street Phone #: ###-#### Inspection requested via web by Brett Klinchuch
PLM20-02325 Sprinkler (Final)6/5/20206/5/20206/5/2020 1:44:59 PMPPASS
Please contact Sergio with any questions - he does not speak English well
Thank yoU! Phone #: ###-#### Inspection requested via web by Kerri Collins
PLM20-01899 Water Heater Final6/2/20206/5/20206/5/2020 11:05:06 AMAPASS
Call Carrie on the way ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
PLM20-02283 Final6/2/20206/5/20206/5/2020 11:04:38 AMAPASS
Please call Brent prior to arrival for inspection. ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby