Inspections for the day of: Friday, August 28, 2009.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00930 ELE-Aging Inspection8/28/20098/28/20099/1/2009 9:10:41 AM DONE
looked at sign, see final
ELE09-00928 Final8/28/20098/28/20098/28/2009 4:17:33 PMPPASS
Please provide final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean talked with contractor, corrections made, ok to final, no esc this project, will see other permit work next week
ESC09-00383 General Inspection8/28/20098/28/20098/28/2009 3:43:56 PMPPASS
looked ok
ESC09-00213 General Inspection8/28/20098/28/20098/28/2009 3:43:07 PMPPASS
looked ok
ESC09-00433 General Inspection8/28/20098/28/20098/28/2009 3:20:10 PMPPASS
looked ok, still needs house sided, will leave permit open till done
ELE09-00773 Final8/28/20098/28/20098/28/2009 3:09:09 PMPPART
Mike Phone #: ###-#### met contractor, correction notice is NEC 400.8 shall not use cords for permanent wiring of building, 408.4 shall complete circuit directory, no esc this project, will call in again
ELE09-01375 Rough-In Permanent Service8/28/20098/28/20098/28/2009 2:06:37 PMPPASS
the meter has moved over 3 feet and the power company wants to do the work today customer can''t be with out power over weekend do you need to look at the new placment be energization or a final inspection? Phone #: ###-#### Internet Inspection Request from: Don Lustig p/s u/g rec ok, Note: check for water pipe ground at next inspection
ELE09-01400 Final8/28/20098/28/20098/28/2009 12:50:12 PMPPASS
this is ready for a final Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover ceilings, ok to final, no esc this project, signed occupancy card
ELE09-01019 Final8/28/20098/28/20098/28/2009 10:55:44 AMACANC
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson wrong address, or permit, called contrator to get permit in order, then call for inspection
ELE09-01365 Final8/27/20098/28/20098/28/2009 10:45:24 AMAPASS
Request final on remodel/addition Phone #: ###-#### Internet Inspection Request from: Tim Lawrence ok to final
ELE09-01607 Conference8/27/20098/28/20098/28/2009 10:24:54 AMADONE
Josh ###-####//call when on way met owner, talked about service, he has to raise mast to clear new roof, service was changed, but no sticker, told that he must provide concrete encased electrode in new foundation, and that the service must be brought up to code to turn power back on
ELE09-01612 Rough-In Permanent Service8/27/20098/28/20098/28/2009 10:11:14 AMAPASS
James Phone #: ###-#### if possible late am inspection please call before going out ri ok, p/s u/g rec ok, no esc this project, check for ground rod at final and panel labels
ESC07-00572 Site Final8/28/20098/28/20098/28/2009 10:08:00 AMADONE
looked at site, ok to site final, all work appears done
ELE09-01491 Final8/27/20098/28/20098/28/2009 10:05:34 AMAPASS
Brian Phone #: ###-#### ok to final, no esc this project
ELE09-01593 Permanent Service8/27/20098/28/20098/28/2009 9:10:11 AMAPASS
**Please call ###-#### for lock box Code. thanks. Need ok for id panel to regenerize the panel. Phone #: ###-#### Internet Inspection Request from: Randy Fletcher called contractor, p/s u/g rec ok, no esc this project
ELE09-01591 Rough-In Permanent Service8/27/20098/28/20098/28/2009 7:46:57 AMAPASS
Homeowner has been without power since yesterday. If someone could get out there early it would be much appreciated. Any questions or concerns please call Clay at ###-####. Thanks. Phone #: ###-#### Internet Inspection Request from: Clay Morgan ric ok, p/s u/g rec ok , no esc this project