ELE10-02254
| ELE-Aging Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 1:20:18 PM | | DONE |
|
|
Unable to leave message
|
ELE12-00369
| Final | 1/26/2015 | 1/27/2015 | 1/27/2015 1:07:24 PM | P | NH |
|
|
Inspection requested via web by Terry Scott Left message with contractor, no acccess
|
ELE15-00168
| Final | 1/27/2015 | 1/27/2015 | 1/27/2015 12:53:50 PM | P | PASS |
|
|
Wade Fitzgerald will be onsite for inspection. Phone #: ###-#### Inspection requested via web by Matthew Dunay Rough IN for potential PV system, box on rooftop, conduit run to disconnect next to panel and J-Box to right and below meter main. GEC conductor run to house GES. No other conductors have been installed.
|
ELE14-02791
| Final | 1/26/2015 | 1/27/2015 | 1/27/2015 12:42:39 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Final OK
|
ELE15-00165
| Rough-In Permanent Service | 1/26/2015 | 1/27/2015 | 1/27/2015 11:49:17 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn RI OK, PS, UG, N, OK
|
ELE15-00164
| Rough-In Permanent Service | 1/26/2015 | 1/27/2015 | 1/27/2015 11:48:45 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn RI OK PS, UG, N,OK
|
ELE12-02116
| ELE-Aging Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 11:22:19 AM | | DONE |
|
|
Rodney will schedule for inspection for next week
|
ELE13-02557
| Final | 1/27/2015 | 1/27/2015 | 1/27/2015 11:01:08 AM | P | PASS |
|
|
Chris Phone #: ###-#### FInal oK
|
ELE15-00198
| Electrical Rough-In | 1/26/2015 | 1/27/2015 | 1/27/2015 10:34:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson RI ok to cover, contractor to open ends of trench for inspection of underground
|
ELE14-02921
| Final | 1/26/2015 | 1/27/2015 | 1/27/2015 9:27:31 AM | A | PASS |
|
|
Gate code is 3162 Phone #: ###-#### Inspection requested via web by Robert Murray corrections made, FinalOK
|
ELE14-03181
| Final | 1/26/2015 | 1/27/2015 | 1/27/2015 9:07:20 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk
|
ELE15-00132
| Temporary Service | 1/26/2015 | 1/27/2015 | 1/27/2015 9:02:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk TS, UG, N, OK
|
ELE15-00106
| Final | 1/27/2015 | 1/27/2015 | 1/27/2015 8:34:18 AM | A | PART |
|
|
Ryan is contact. PARTIAL final. Talk to Cevyn Recla before going. Thank you Phone #: ###-#### Inspection requested via web by Chris Chesnut construction is being done in phases to allow hotel operations to continue. This is for the west side of the lobby, partial final given for west side of lobby, work has not begun on east side.
|