ELE18-03561
| Permanent Service | 10/15/2018 | 10/19/2018 | 10/19/2018 2:53:23 PM | P | PASS |
|
|
Ben Phone #: ###-#### p/s o/h rec ok
|
ELE18-02576
| Electrical Rough-In | 10/19/2018 | 10/19/2018 | 10/19/2018 2:24:30 PM | P | PASS |
|
|
Rough in Building C breezeway. Gear consultation also. Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Building C breezway and stairs ok to cover Service discussion on bonding and location in main with AFC calc needed
|
ELE18-01943
| Final | 10/19/2018 | 10/19/2018 | 10/19/2018 2:19:45 PM | P | PASS |
|
|
Kenny is the contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Final ok
|
ELE18-01790
| Final | 10/17/2018 | 10/19/2018 | 10/19/2018 2:19:26 PM | P | PASS |
|
|
CALL AARON WITH ANY QUESTIONS Phone #: ###-#### Inspection requested via web by Dana Vance Sign final ok
|
ELE18-02005
| Final | 10/17/2018 | 10/19/2018 | 10/19/2018 2:19:04 PM | P | PASS |
|
|
CALL AARON VANCE FOR QUESTIONS Phone #: ###-#### Inspection requested via web by Dana Vance Sign final ok
|
ELE18-02181
| Permanent Service | 10/18/2018 | 10/19/2018 | 10/19/2018 2:18:41 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins 120.24 AFC calc required proir to service being energized
|
ELE18-02562
| Final | 10/19/2018 | 10/19/2018 | 10/19/2018 2:04:58 PM | P | PART |
|
|
As per Electrical Engineer area has been de-classified as a hazardous area and is ok to occupy this garage at this time..
|
ELE18-02014
| Electrical Rough-In | 10/19/2018 | 10/19/2018 | 10/19/2018 1:29:40 PM | P | PASS |
|
|
Unit 240 ok to cover
|
ELE18-03906
| Electrical Rough-In | 10/19/2018 | 10/19/2018 | 10/19/2018 1:17:27 PM | P | PASS |
|
|
Robert Phone #: ###-#### Verified listing of Solar Array system
|
ELE18-03841
| Final | 10/18/2018 | 10/19/2018 | 10/19/2018 1:04:52 PM | A | PASS |
|
|
Final for bay lights in gas canopy area Final for canopy lights ok
|
ELE18-03957
| Permanent Service | 10/18/2018 | 10/19/2018 | 10/19/2018 1:04:25 PM | A | PASS |
|
|
Should be ready after 10am so that Idaho Power can come back and rehook power. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Grounding will be brought ot code for final p/s o/h rec ok
|
ELE18-04025
| Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 11:04:08 AM | A | PASS |
|
|
This is for the underground. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan U/G from detached garage to house only ok to cover
|
ELE18-03283
| Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 10:37:49 AM | A | PASS |
|
|
Inspection for bath floor heat. Phone #: ###-#### Inspection requested via web by Terry Scott Master bath floor heat ok to cover
|
ELE18-01334
| Permanent Service | 10/18/2018 | 10/19/2018 | 10/19/2018 10:13:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Vitaliy Berezin AFC calc is L,L @2,240 amps, Main is rated at 10K p/s o/h rec ok
|
ELE18-04011
| Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 9:45:06 AM | A | PASS |
|
|
Wall inspection please Phone #: ###-#### Inspection requested via web by Winters LLC Walls only ok to cover(could not locate print on site) Go through door 10352 for better access
|
ELE18-03837
| Final | 10/18/2018 | 10/19/2018 | 10/19/2018 9:24:33 AM | A | PASS |
|
|
Use front main doors for entrance Phone #: ###-#### Inspection requested via web by David Feller
Temp Occ card signed for perm occ Final ok
|
ELE18-04008
| Electrical Rough-In | 10/18/2018 | 10/19/2018 | 10/19/2018 8:38:27 AM | A | PASS |
|
|
Access to the new addition from the back yard. Please call Doug with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Barbara Szurgot Rough-in for master bed and bath ok to cover
|
ELE18-03654
| Electrical Rough-In | 10/16/2018 | 10/19/2018 | 10/16/2018 2:30:58 PM | P | CANC |
|
|
after 9 // Jake Phone #: ###-####
|