Inspections for the day of: Tuesday, April 2, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00923 Rough-In Permanent Service4/2/20194/2/20194/2/2019 1:41:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Therrin Robertson
Will need to verify utility bond for final(discussed this with wireman on the first of jobs )
Rough-in ok to cover
ELE19-00922 Rough-In Permanent Service4/2/20194/2/20194/2/2019 1:40:25 PMPPASS
Phone #: ###-#### Inspection requested via web by Therrin Robertson
Need to verify Utility bond for final(talked to wireman on first of three jobs and advised him to have them)
Rough-in ok to cover
ELE19-00037 Final4/1/20194/2/20194/2/2019 1:24:58 PMPCANC
Phone #: ###-#### Inspection requested via web by michael hunt
ELE19-00600 Conference4/2/20194/2/20194/2/2019 12:19:51 PMPDONE
Would like to walk thru existing electrical service and get info on required changes to service drop, grounding, etc if the panel is replaced/upgrade. Phone #: ###-#### Inspection requested via web by Thomas Scheid
Discussed service change options for exterior mounted main, Also discussed grounding with 2 ground rods being used as cannot conform water pipe is metal all the way underground.
ELE19-01132 Temporary Service4/1/20194/2/20194/2/2019 11:18:52 AMAPASS
Phone #: ###-#### Inspection requested via web by Nick Larson
t/s u/g n ok
ELE19-00747 Electrical Rough-In4/1/20194/2/20194/2/2019 10:10:14 AMAPASS
Electrical rough in inspection on Units 137, 139, 238 and 239. Phone Nick Prieto for questions and access. Phone #: ###-#### Inspection requested via web by Tod Lane
Units as requested ok to cover
ELE19-01023 Electrical Rough-In4/2/20194/2/20194/2/2019 10:09:49 AMAPASS
panel wall
please call 30 min prior to inspection Phone #: ###-#### Inspection requested via web by John Edwards
Panel wall ok to cover
ELE19-01111 Electrical Rough-In4/1/20194/2/20194/2/2019 12:00:00 AMACANC
STEVE RESCHEDULE INSPECTION FOR THE NEXT MORN. j.a.//We will be looking for a cover inspection for the underground portion to the sub-panel raceway only today once its trenched! please call me if you could before coming, Thanks, Steve, BPL Phone #: ###-#### >> Inspection requested via web by Steven Meredith