Inspections for the day of: Thursday, May 30, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00909 Final5/30/20195/30/20195/30/2019 3:00:14 PMPPASS
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson
Occ card signed
final ok
ELE19-00030 Electrical Rough-In5/29/20195/30/20195/30/2019 2:59:48 PMPPASS
West side of the showroom.
On-site contact: Wade Luthy ###-#### Phone #: ###-#### Inspection requested via web by Bryan Atkins
West side walls ok to cover
ELE19-01981 Electrical Rough-In5/30/20195/30/20195/30/2019 1:18:35 PMPFAIL
Recessed can roughin for cover Phone #: ###-#### Inspection requested via web by Steve Craig
1)Unused openings shall be closed
2) Type MC shall be supported within 6' between runs and 12" of a box
3) main run from building has a big nick in wire and needs replaced
ELE19-01980 Temporary Service5/30/20195/30/20195/30/2019 12:23:28 PMPCANC
Temporary power pole Phone #: ###-#### >> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
ELE19-01970 Conference5/29/20195/30/20195/30/2019 12:15:47 PMPCANC
Julio please call for access Phone #: ###-####
Inspector 445 scheduled himself for this conference
ELE19-01955 Final5/30/20195/30/20195/30/2019 12:14:27 PMAPASS
I will be on site at 9am to open electrical room. The unit is on front porch. Phone #: ###-#### Inspection requested via web by Taras Shulga
Final for mini split unit ok
ELE19-01889 Final5/29/20195/30/20195/30/2019 11:53:10 AMAPASS
Please call Thomas 20 minutes before arrival and he will meet inspector at the job site Phone #: ###-#### Inspection requested via web by Keith Chetta
Final ok
ELE19-00747 Final5/29/20195/30/20195/30/2019 11:35:20 AMAPASS
Final on last 3 units for this phase. Units 127, 129, 225. Justin will be available on site for access to units. Phone #: ###-#### Inspection requested via web by Tod Lane
Final for phase ok
ELE18-04715 Final5/30/20195/30/20195/30/2019 10:43:46 AMACANC
No final at this time
ELE18-04715 Electrical Rough-In5/30/20195/30/20195/30/2019 10:43:23 AMPPASS
Front reception desk and U/G ok to cover
Checked first floor rooms with retro fit lighting and conference room are ok(2 rooms on west wing need smoke detectors re-installed)
Note* east wing ceiling in hallway needs addressed multiple violations exist and EC has been warned of them and needs fixed in order to cover....
ELE19-01775 Final5/29/20195/30/20195/30/2019 9:59:31 AMAPASS
Please call if you need me to be there for the final it will be unlocked and superintendent will be there Phone #: ###-#### Inspection requested via web by TRENT Swaim
Occ card signed
Final ok
ELE18-04715 Final5/29/20195/30/20195/30/2019 9:56:43 AMAPASS
Final for 1st Floor Rms , Conference rm, hallway and ceiling rough in. Phone #: ###-#### Inspection requested via web by Dan Cox
Occ card signed
Final ok
ELE19-00899 Final5/30/20195/30/20195/30/2019 9:44:32 AMAPASS
Phone #: ###-#### Inspection requested via web by Kevin Burke
Final ok
ELE19-00587 Final5/30/20195/30/20195/30/2019 9:11:14 AMAFAIL
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack
*Conduit to J-box of pump has seperated
*Label circuit breakers
*W/R GFCI required
*Conductors #4 and larger shall be required to have a bushing