ELE16-01309
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 3:05:11 PM | P | PASS |
|
|
would like call ahead; Mucho Phone #: ###-#### final ok
|
ELE16-01440
| Electrical Rough-In | 5/4/2016 | 5/5/2016 | 5/5/2016 2:52:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNY EMEL main entry from carport/downstairs conference room/2nd floor bed and bath/ all of 3rd floor rough-in ok cover. GC stated all branch circuits pulled in 12 gauge mixed wuth 14 gauge will be on a 15 amp branch circuit
|
ELE16-01443
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 2:06:55 PM | P | FAIL |
|
|
A/C disconnect w/ service GFI Call Steve Gillis for access ###-#### Phone #: ###-#### Inspection requested via web by jamie berg 440.12 OCPD shall be sized on basis of nameplate rating
|
ELE16-00914
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 1:33:50 PM | P | PASS |
|
|
Please call Bill for entry info. Phone #: ###-#### Inspection requested via web by Rhonda Yoast back patio turn into sitting room final ok
|
ELE16-01416
| Electrical Rough-In | 5/3/2016 | 5/5/2016 | 5/5/2016 1:02:29 PM | P | CANC |
|
|
Spa bonding inspection Phone #: ###-#### Inspection requested via web by Emmet Bushman not ready at tis time
|
ELE16-00977
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 12:40:09 PM | P | FAIL |
|
|
Please call in advance, will meet you at the site. Thanks, Tony Phone #: ###-#### Inspection requested via web by Scott Campbell 110.14(b) wire connectors or splices shall be listed for direct burial 690.31(b) PV source circuits shall not be contained in the same j-box as non-PV systems
|
ELE16-01439
| Permanent Service | 5/4/2016 | 5/5/2016 | 5/5/2016 12:00:10 PM | P | CANC |
|
|
Changed service from 125 Amp to 200 Amp Phone #: ###-#### Inspection requested via web by Alan Lusk idaho power couldnt make it out until 5/6/16
|
ELE16-01161
| Final | 5/4/2016 | 5/5/2016 | 5/5/2016 11:06:27 AM | A | PASS |
|
|
Dar Phone #: ###-#### solar array final ok
|
ELE16-00943
| Electrical Rough-In | 5/2/2016 | 5/5/2016 | 5/5/2016 10:41:12 AM | A | PASS |
|
|
Brett Phone #: ###-#### master bed and bath ok cover
|
ELE16-00512
| Final | 5/4/2016 | 5/5/2016 | 5/5/2016 10:29:30 AM | A | PASS |
|
|
Dan Phone #: ###-#### correction fixed
|
ELE16-01424
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 10:21:39 AM | P | CANC |
|
|
Inspecting our Solar Rough In Conduit. It runs from roof mounted junction box to exterior mounted pvc junction.
Call if you have questions. Phone #: ###-#### Inspection requested via web by Matthew Dunay
|
ELE16-01424
| Electrical Rough-In | 5/5/2016 | 5/5/2016 | 5/5/2016 10:20:33 AM | P | PASS |
|
|
Inspecting our Solar Rough In Conduit. It runs from roof mounted junction box to exterior mounted pvc junction.
Call if you have questions. Phone #: ###-#### Inspection requested via web by Matthew Dunay solar array conduit run ok cover
|
ELE16-00876
| Electrical Rough-In | 5/4/2016 | 5/5/2016 | 5/5/2016 10:19:22 AM | A | PASS |
|
|
Up stairs got changed to a master bed and bath fire place down stairs and entry got changed Phone #: ###-#### Inspection requested via web by Erick Baker changes to master and entry and up bed ok cover
|
ELE16-00607
| Temporary Service | 5/5/2016 | 5/5/2016 | 5/5/2016 9:57:10 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet correction fixed t/s o/h n ok
|
ELE15-03729
| Electrical Rough-In | 5/4/2016 | 5/5/2016 | 5/5/2016 9:49:42 AM | A | PASS |
|
|
Please call 30 min prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton units 108,109,110,111,208,209,210,211,308,309,310,311 ok cover
|
ELE16-01368
| Final | 5/4/2016 | 5/5/2016 | 5/5/2016 9:17:59 AM | A | PASS |
|
|
Walter Phone #: ###-#### final ok
|
ELE16-00368
| Final | 5/5/2016 | 5/5/2016 | 5/5/2016 9:17:54 AM | A | PASS |
|
|
Garage code 9877. Please call Jeff if you have any questions. Thanks Phone #: ###-#### Inspection requested via web by Brandon Blackham corrections fixed final ok
|