ELE19-01406
| Electrical Rough-In | 6/26/2019 | 6/26/2019 | 6/26/2019 2:51:27 PM | P | PASS |
|
|
Level 1 area 2 ceiling, level 2 area A unit ceilings and top out, level 2 B bathrooms and top out. Phone #: ###-#### Inspection requested via web by Tom Betty Areas as noted for area1@2 with top out baths ok to cover ceilings
|
ELE19-02353
| Permanent Service | 6/26/2019 | 6/26/2019 | 6/26/2019 2:21:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins t/s o/h n ok
|
ELE19-02036
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 1:49:53 PM | P | PASS |
|
|
We are upgrading service and would like to get OK to energize early PM if possible so IPCO can hook us back up? Thank You Phone #: ###-#### Inspection requested via web by Kelly Felin p/s u/g rec ok
|
ELE17-02325
| Final | 6/26/2019 | 6/26/2019 | 6/26/2019 1:06:53 PM | P | PASS |
|
|
Requesting for final inspection Phone #: ###-#### Inspection requested via web by robert feller Service change final ok
|
ELE19-01549
| Final | 6/26/2019 | 6/26/2019 | 6/26/2019 12:59:40 PM | P | CANC |
|
|
Jason is contact number. Pad lock number is 2914 Phone #: ###-#### Inspection requested via web by Sherry Allen No final at this time, need p/s
|
ELE19-01549
| Permanent Service | 6/26/2019 | 6/26/2019 | 6/26/2019 12:59:32 PM | P | PASS |
|
|
Jason is contact number. Pad lock number is 2914 Phone #: ###-#### Inspection requested via web by Sherry Allen p/s u/g n ok no meter needed
|
ELE19-01685
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 11:25:37 AM | A | PASS |
|
|
Basement Ceiling cover. Randy is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Basement bathrooms ceilngs ok to cover
|
ELE19-01585
| Permanent Service | 6/25/2019 | 6/26/2019 | 6/26/2019 10:57:59 AM | A | PASS |
|
|
Please call Travis 30 min prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Finished grade will provide height requirements AFCI calc 43,698 as provided on e-plan review and will posted for final p/s u/g n ok 3 meters
|
ELE19-02374
| Temporary Service | 6/25/2019 | 6/26/2019 | 6/26/2019 10:35:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas T/s u/g n ok
|
ELE19-01978
| Final | 6/25/2019 | 6/26/2019 | 6/26/2019 10:19:54 AM | A | PASS |
|
|
Final for office space remodel (outlets and lighting) Phone #: ###-#### Inspection requested via web by Kendra Lanham No Occ card on site Final ok
|
ELE19-00906
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 9:55:02 AM | A | PASS |
|
|
Approval for cover in rooms with grid. I will be onsite at 9:30 Phone #: ###-#### Inspection requested via web by Sean Patton Areas with suspended ceiling are ok to cover
|
ELE18-01935
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 6:47:14 AM | A | CANC |
|
|
Rough in Heated floor mat for Unit 307 Contact John (Homey) McElroy Thank you, Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|