ELE13-01374
| ELE-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/2/2016 7:50:45 AM | | CANC |
|
|
too busy
|
ELE13-01366
| ELE-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/2/2016 7:50:35 AM | | CANC |
|
|
too busy
|
ELE13-01339
| ELE-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/2/2016 7:50:24 AM | | CANC |
|
|
too busy
|
ELE13-01273
| ELE-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/2/2016 7:50:00 AM | | CANC |
|
|
too busy
|
ELE16-00089
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 2:16:40 PM | P | PART |
|
|
4th floor temp occ ok
|
ELE16-00089
| Electrical Rough-In | 9/1/2016 | 9/1/2016 | 9/1/2016 2:15:46 PM | P | PASS |
|
|
Call Rafael for inspection of 4th floor Clearwater. Phone #: ###-#### Inspection requested via web by Rafael Castillo GBAD level 3 transformer ok to energize, lobby ceiling ok cover other the area with core and shell permit wiring, it is marked on print.
|
ELE15-03901
| Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 2:13:59 PM | P | PASS |
|
|
Call Pierce for inspection of office furniture connections on the 8th floor (partial only for the furniture on the 8th floor, more to come). Phone #: ###-#### Inspection requested via web by Rafael Castillo verified connections and wiring of office furniture(plug testedas well) 8th floor N&W areas noted on print ok,E side still to needs to be finished.
|
ELE16-02439
| Final | 8/31/2016 | 9/1/2016 | 9/1/2016 1:58:08 PM | P | PASS |
|
|
Install 1 cantilever mounted wall sign reading Deli. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen final ok
|
ELE16-02320
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 12:32:30 PM | P | FAIL |
|
|
Garage door will be unlocked out back Phone #: ###-#### Inspection requested via web by daniel bibikov 406.5 receptacles shall be securely mounted(washer and other recept in laundry in-op) 110.3(b) shall not exceed manufactors specifications (main for sub-panel is in a max load 50 amp location in main) 422.30 Disconnect required for dishwasher&furnace
|
ELE16-02730
| Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 11:47:39 AM | P | PASS |
|
|
UG Early pm if possible please Phone #: ###-#### Inspection requested via web by Kerri Hamilton s.w of building underground ok cover
|
ELE16-00089
| Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 11:01:15 AM | A | NR |
|
|
Call Rafael for TCO final of only the 4th floor in the Clearwater side of building. Phone #: ###-#### Inspection requested via web by Rafael Castillo Will need blank covers on all lv boxes and trim out outlet for drinking fountain, field identification for panels as well
|
ELE16-01402
| Final | 8/31/2016 | 9/1/2016 | 9/1/2016 10:51:57 AM | A | PASS |
|
|
Install 1 free standing monument sign with Message Center. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen monument sign final ok
|
ELE15-00495
| Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 10:51:25 AM | A | PASS |
|
|
Wall cover inspection. 4th floor elevator shaft wall in GBAD. Contact is Mark Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves 4th floor elevator wall ok cover
|
ELE16-01134
| Electrical Rough-In | 8/31/2016 | 9/1/2016 | 9/1/2016 12:00:00 AM | A | PASS |
|
|
Stair 1, level 6 Phone #: ###-#### Inspection requested via web by Clint Tate Discussed with Bobbi about layout with receptacles in rooms and having to comply with 210.52 for layout. Stair 1 level 6 walls ok cover
|