Inspections for the day of: Wednesday, September 11, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03354 Electrical Rough-In9/10/20199/11/20199/11/2019 3:25:16 PMPPASS
Swimming pool bonding and underground cover. Phone #: ###-#### Inspection requested via web by Kevin Koomler
U/G and 4 corners and 1 light bonding and run back to equipment with U/G as well ok to cover
ELE19-03406 Electrical Rough-In9/11/20199/11/20199/11/2019 2:37:54 PMPPASS
Joesoph Phone #: ###-####
Verified U/L listing of Solar Array install of line side tap install and scope of work.....
ELE19-02772 Electrical Rough-In9/11/20199/11/20199/11/2019 2:36:05 PMPPASS
CONTACT: MIKE MULVAHILL - ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden
Ceiling only ok to cover
ELE19-02771 Permanent Service9/10/20199/11/20199/11/2019 2:35:36 PMPPASS
Contact: Mike Mulvahill Phone #: ###-#### Inspection requested via web by Deb Gooden
p/s u/g n ok
1meter needed
ELE19-02772 Permanent Service9/10/20199/11/20199/11/2019 2:34:03 PMPPASS
Contact: Mike Mulvahill Phone #: ###-#### Inspection requested via web by Deb Gooden
p/s u/g n ok
1meter needed
ELE18-03465 DOC - Permit Finaled9/11/20199/11/20199/11/2019 11:53:50 AMPPASS
ELE19-00618 Final9/10/20199/11/20199/11/2019 11:44:57 AMAPASS
Garage code 0235E Phone #: ###-#### Inspection requested via web by Alan Lusk
Final ok
ELE19-03400 Final9/10/20199/11/20199/11/2019 10:54:51 AMAPASS
repaired service mast from tree damage. Please inspect so Idaho Power will hook back up. Thanks Inspection requested via web by CHRIS CARMINE
Replace of weatherhead on mast ok
p/s o/h rec ok
ELE19-03403 Temporary Service9/10/20199/11/20199/11/2019 10:15:10 AMAPASS
Contact Dave Mackey at ###-#### Phone #: ###-#### Inspection requested via web by David Mackey
t/s o/h n ok
ELE19-03377 Electrical Rough-In9/10/20199/11/20199/11/2019 10:02:38 AMAPASS
We will be onsite at 8AM with the equipment Phone #: ###-#### Inspection requested via web by Jesse Simpson
Verifeid U/L listng of Solar Array equipment and scope of work, Approved plains must be onsite for final inspection
ELE19-03392 Rough-In Permanent Service9/10/20199/11/20199/11/2019 9:37:46 AMAPASS
thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren
Rough-in ok to cover
p/s u/g n ok
ELE19-03402 Electrical Rough-In9/10/20199/11/20199/11/2019 9:21:40 AMAPASS
bonding inspection for new pool (rebar) Call Jordan with any questions 2088912289 Phone #: ###-#### Inspection requested via web by Jordan Camie
Pool bonding on all 4 corners and 1 light ok to cover
ELE19-03396 Electrical Rough-In9/10/20199/11/20199/11/2019 9:09:25 AMAPASS
This electrical rough has been previously inspected under electrical permit ELE19-01497 by Eric Story. The original rough in/permanent service inspection under permit ELE19-01497 included the home, the garage and the area above the garage. The city has requested a separate permit be pulled for the dwelling above the garage so now we are needing another rough inspection for the area above the garage under the new permit ELE19-03396. If at all possible, we would like Eric Story to be consulted from his original inspection of this area under the original permit ELE19-01497. Phone #: ###-#### Inspection requested via web by Rodney Monroe
ADU unit an detached garage ok to cover