Inspections for the day of: Wednesday, September 12, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02300 Electrical Rough-In9/12/20189/12/20189/12/2018 5:31:06 PMPDONE
Exterior wall rough in and lift station Phone #: ###-#### Inspection requested via web by Jason Parke
Conference needed
ELE18-02300 Conference9/12/20189/12/20189/12/2018 5:30:57 PMPDONE
Exterior wall rough in and lift station Phone #: ###-#### Inspection requested via web by Jason Parke
Discussed a seal off once entrying building from methane gas and will be installed within 18" from when it enters the room
ELE18-02156 Rough-In Permanent Service9/12/20189/12/20189/12/2018 3:33:32 PMPPASS
Walls Phone #: ###-#### Inspection requested via web by Ron Zimmerman
Walls and 1 hard lid ok to cover
ELE18-02290 Final9/12/20189/12/20189/12/2018 3:05:56 PMPPASS
Phone #: ###-#### Inspection requested via web by Hidajet Zahic
fInal ok
ELE18-03495 Electrical Rough-In9/12/20189/12/20189/12/2018 2:58:45 PMPPASS
Sid Phone #: ###-####
There was no conference as the owner is very good at electrical.
Sunroom ok to cover
ELE18-02953 Electrical Rough-In9/12/20189/12/20189/12/2018 2:54:46 PMPPASS
Perimeter lights wall cover Phone #: ###-#### Inspection requested via web by cris flores
Perimeter wall lights ok to cover
ELE18-03460 Final9/11/20189/12/20189/12/2018 2:23:23 PMPPASS
New service change. Please inspect as early in afternoon as possible, in order for Idaho Power to come back and re-energize. Thank you. Phone #: ###-#### Inspection requested via web by Kevin Perez
p/s o/h rec ok
ELE18-03108 Electrical Rough-In9/12/20189/12/20189/12/2018 2:13:41 PMPCANC
Underground Inspection any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller
ELE18-03301 Rough-In Permanent Service9/11/20189/12/20189/12/2018 1:51:18 PMPPASS
Manufactured home Phone #: ###-#### Inspection requested via web by jamie berg
p/s u/g n ok
ELE18-03470 Temporary Service9/12/20189/12/20189/12/2018 1:30:46 PMPPASS
Please re inspect. Corrections from yesterday have been made. Phone #: ###-#### Inspection requested via web by Kelly Tarter
t/s u/g n ok
ELE18-03458 Final9/12/20189/12/20189/12/2018 1:30:22 PMPPASS
Robert Phone #: ###-####
Final ok
ELE17-02625 Conference9/10/20189/12/20189/12/2018 12:45:41 PMPPASS
Charles Phone #: ###-####
Owner very knowledgable and is aware of codes and requirments
ELE18-02312 Electrical Rough-In9/11/20189/12/20189/12/2018 12:44:52 PMAPASS
This is for the pool house and outdoor kitchen in the back. It will be open. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan
Pool house ok to cover, Electrician will verify if a bond is needed for hot tub to metal post
ELE15-03211 Final9/11/20189/12/20189/12/2018 11:14:30 AMAFAIL
Please call ahead for access - Meg Phone #: ###-####
All receptacles located within 6' of a sink shall have GFCI
All hard wired devices shall have means of disc
LB on back is missing a cover
ELE18-03450 Final9/10/20189/12/20189/12/2018 10:38:04 AMAPASS
Phone #: ###-#### Inspection requested via web by Same Electric
Final ok
ELE18-03200 Final9/12/20189/12/20189/12/2018 9:55:31 AMAPASS
Please call Mike Cole with any questions ###-#### Phone #: ###-#### Inspection requested via web by Bonnie Page
Final ok
ELE18-03477 Electrical Rough-In9/11/20189/12/20189/12/2018 9:24:13 AMAPASS
Phone #: ###-#### Inspection requested via web by Bryan AtkinsWork station area wall only ok to cover
ELE18-03452 Rough-In Permanent Service9/11/20189/12/20189/12/2018 9:05:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Heath Thomas
Rough-in ok to cover
ELE18-03459 Final9/11/20189/12/20189/12/2018 8:55:56 AMAPASS
Final ok