PLM19-01278
| Final | 4/3/2019 | 4/3/2019 | 4/3/2019 3:08:49 PM | P | PART |
|
|
Enter Through East Side of Building at Briggs Engineering. Water Heater is at First Left Closet Down the Hall. Phone #: ###-#### Inspection requested via web by Samuel Drake-Water heater pass. DBCA needs tested.
|
PLM19-01283
| Groundwork | 4/3/2019 | 4/3/2019 | 4/3/2019 3:03:26 PM | P | PASS |
|
|
Mait Phone #: ###-#### Inspection requested via web by Jerry Downer
|
PLM19-01277
| Water Heater Final | 4/3/2019 | 4/3/2019 | 4/3/2019 3:01:11 PM | P | CANC |
|
|
PLEASE CALL WHEN ON THE WAY. THANK YOU Phone #: ###-#### Inspection requested via web by Chris Field-Changed to tomorrow mourning.
|
PLM19-01122
| Plumbing Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 2:19:59 PM | P | PASS |
|
|
Job # 20312 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-04578
| Final | 4/2/2019 | 4/3/2019 | 4/3/2019 1:42:14 PM | P | PASS |
|
|
Please call Mike 30 min prior to arrival. Does not live there so he needs enough time to get there if you could please call him when you are on your way Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
PLM19-01285
| Other | 4/3/2019 | 4/3/2019 | 4/3/2019 1:16:37 PM | P | DONE |
|
|
conference Phone #: ###-#### Inspection requested via web by Andrea Grigsby-Conferance on sewer.
|
MEC19-00825
| Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 12:40:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
PLM19-01156
| Final | 4/3/2019 | 4/3/2019 | 4/3/2019 11:42:24 AM | P | CANC |
|
|
Lock box Code is 1830 Phone #: ###-#### >> Inspection requested via web by Steve Spence Inspection cancelled from web by: Steve Spence
|
MEC19-00825
| Pressure Test | 4/2/2019 | 4/3/2019 | 4/3/2019 11:37:53 AM | A | PASS |
|
|
Rough In also (listed as PM but AM okay) Phone #: ###-#### Inspection requested via web by Lisa Whitney-20 lb gas test pass.
|
PLM19-01261
| Groundwork | 4/2/2019 | 4/3/2019 | 4/3/2019 11:07:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|
PLM19-01260
| Groundwork | 4/2/2019 | 4/3/2019 | 4/3/2019 11:07:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|
PLM19-00781
| Water Heater Final | 4/3/2019 | 4/3/2019 | 4/3/2019 11:03:24 AM | P | PASS |
|
|
|
PLM19-00380
| Final | 4/3/2019 | 4/3/2019 | 4/3/2019 10:23:06 AM | A | PASS |
|
|
Call me for key location please Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
|
PLM18-04625
| Final | 4/2/2019 | 4/3/2019 | 4/3/2019 10:22:14 AM | A | PASS |
|
|
Key above electrical panel. if questions call Ron @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM19-01238
| Water and/or Sewer | 4/2/2019 | 4/3/2019 | 4/3/2019 9:43:56 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Scott Wickstrom-Outside waterline ok to cover, pvb needs tested & need blow out tee. No access to inside for repipe, left notice.
|
PLM19-01276
| Plumbing Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 8:51:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
PLM19-01245
| Plumbing Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 8:21:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
|