PLM18-04104
| Other | 9/27/2018 | 9/27/2018 | 9/27/2018 3:22:12 PM | P | DONE |
|
|
conference- call 10 mins ahead- Casey Phone #: ###-####-Conferance on water.
|
PLM18-04103
| Other | 9/27/2018 | 9/27/2018 | 9/27/2018 3:21:44 PM | P | DONE |
|
|
conference- call 10 mins ahead- Casey Phone #: ###-####-Conferance on water.
|
PLM17-00193
| Other | 9/27/2018 | 9/27/2018 | 9/27/2018 3:07:10 PM | P | DONE |
|
|
Scott-conference would like after 2 if possible Phone #: ###-####-Conferance on dwv.
|
PLM18-03523
| Groundwork | 9/27/2018 | 9/27/2018 | 9/27/2018 2:32:07 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Section of pressure sewer ok to cover as long as it is per lift station specs.
|
PLM17-04821
| Pressure Test | 9/27/2018 | 9/27/2018 | 9/27/2018 2:01:17 PM | P | PART |
|
|
Good Morning, This is a very small section of IW from two Fan Units on the Rooftop, tying into Gravity Drain IW Main. Thank you. Phone #: ###-#### Inspection requested via web by RM Mechanical-Section complete is marked in test result book.
|
PLM18-03982
| Water and/or Sewer | 9/27/2018 | 9/27/2018 | 9/27/2018 1:37:03 PM | P | PART |
|
|
Waterline-OK to cover except connections.
|
PLM18-02630
| Final | 9/26/2018 | 9/27/2018 | 9/27/2018 1:10:28 PM | P | PASS |
|
|
call me if there is no one there and I can meet you or tell you where the key is. It is vacant. Jon Van Vleet ###-#### Phone #: ###-#### Inspection requested via web by Jon Van Vleet
|
PLM18-04084
| Final | 9/26/2018 | 9/27/2018 | 9/27/2018 1:04:47 PM | P | PASS |
|
|
Please call Jeff 30 min prior Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
PLM18-04063
| Water and/or Sewer | 9/26/2018 | 9/27/2018 | 9/27/2018 12:48:44 PM | P | PASS |
|
|
Contact Luke - ###-#### - Inspection of waste line Inspection requested via web by Luke Karel
|
PLM18-01601
| Final | 9/27/2018 | 9/27/2018 | 9/27/2018 12:07:15 PM | P | PASS |
|
|
###-#### darren
|
PLM18-00029
| Water and/or Sewer | 9/27/2018 | 9/27/2018 | 9/27/2018 12:06:53 PM | P | PASS |
|
|
inspections completed, schedule to final - Mandy Phone #: ###-####
|
PLM18-00029
| DOC - Permit Finaled | 9/27/2018 | 9/27/2018 | 9/27/2018 12:06:43 PM | P | PASS |
|
|
|
PLM18-02959
| Final | 9/27/2018 | 9/27/2018 | 9/27/2018 11:52:02 AM | P | PASS |
|
|
2724 ENTER JOB # 19828 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-04040
| Water and/or Sewer | 9/27/2018 | 9/27/2018 | 9/27/2018 11:34:41 AM | P | PART |
|
|
water line - Ron Phone #: ###-####-Waterline ok to cover, backflow needs tested.
|
PLM18-04063
| Water and/or Sewer | 9/26/2018 | 9/27/2018 | 9/27/2018 11:26:28 AM | A | PART |
|
|
Partial inspection, please, of the water line installation. Phone #: ###-#### Inspection requested via web by Luke Karel-Left correction notice to resubmit plans for a ADU. Building permit is for a storage shed only. Inspection requested via web by Luke Karel-Waterline ok to cover.
|
PLM18-03394
| Final | 9/26/2018 | 9/27/2018 | 9/27/2018 10:57:13 AM | A | PART |
|
|
Phone #: 2089412422 >> Inspection requested via mobile web by Brandon Van Wey -Need to install a rpba on steam oven.
|
PLM18-03252
| Final | 9/26/2018 | 9/27/2018 | 9/27/2018 10:33:32 AM | A | PASS |
|
|
Is ready and the House will be open all day Phone #: ###-#### Inspection requested via web by david colburn
|
PLM18-01403
| Plumbing Rough-in | 9/26/2018 | 9/27/2018 | 9/27/2018 10:06:32 AM | A | PART |
|
|
First Floor Area C Restroom Waste/Vent ; Water Phone #: ###-#### Inspection requested via web by RM Mechanical-Section passed is marked in test result book. Missing nailplates on waterlines and hosebibs are backgraded.
|
PLM17-02644
| PLM-Aging Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 9:32:50 AM | | FAIL |
|
|
TML still has not called back in for correction.
|
PLM18-03982
| Water and/or Sewer | 9/26/2018 | 9/27/2018 | 9/27/2018 9:31:59 AM | A | PART |
|
|
installation of pressure sewer discharge pipe. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Ok to cover pressure sewer. Still need lift station and tie-in at sewer.
|
PLM18-03974
| Plumbing Rough-in | 9/26/2018 | 9/27/2018 | 9/27/2018 9:07:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence
|
PLM18-04098
| Water and/or Sewer | 9/27/2018 | 9/27/2018 | 9/27/2018 8:56:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darren Wood
|
PLM18-04098
| DOC - Permit Finaled | 9/27/2018 | 9/27/2018 | 9/27/2018 8:56:05 AM | P | PASS |
|
|
|
PLM17-03799
| PLM-Aging Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 6:46:45 AM | | PART |
|
|
No calls
|
PLM18-04063
| Water and/or Sewer | 9/26/2018 | 9/27/2018 | 9/27/2018 12:00:00 AM | A | CANC |
|
|
Contact - Luke ###-#### Inspection of waste line. Phone #: ###-#### >> Inspection requested via web by Luke Karel
|