BLD12-02727
| FIRE-Conference | 2/21/2013 | 2/21/2013 | 2/21/2013 3:55:21 PM | P | DONE |
|
|
Conference with tenant regarding life safety conditions for occupancy approval.
|
BLD12-03208
| FIRE-Final Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 3:54:01 PM | P | PASS |
|
|
Call Brian McCoy ###-#### for access Phone #: ###-#### >> Inspection requested via web by Brian McCoy
|
FIR12-00427
| INSP-Sprinkler Rough-in/Hydro | 2/21/2013 | 2/21/2013 | 2/21/2013 3:53:04 PM | P | CANC |
|
|
Overbooked
|
BLD13-00150
| FIRE-Final Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 3:19:53 PM | P | PASS |
|
|
Jesse Phone #: ###-####
|
BLD12-02420
| FIRE-Final Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 3:19:17 PM | P | NR |
|
|
Project related fire sprinkler permit needs finaled prior to BLD fire life safety.
|
BLD13-00247
| FIRE-Final Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 2:48:14 PM | P | PASS |
|
|
Life safety inspection passed.
|
FIR12-00574
| INSP-Sprinkler Rough-in/Hydro | 2/20/2013 | 2/21/2013 | 2/21/2013 1:37:45 PM | A | PART |
|
|
Mark J is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR12-00410
| FIR-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 1:27:58 PM | | DEFR |
|
|
|
FIR12-00551
| FIR-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 1:26:35 PM | | PEND |
|
|
|
FIR12-00038
| FIR-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 1:24:32 PM | | DONE |
|
|
|
FIR12-00323
| FIR-Aging Inspection | 2/21/2013 | 2/21/2013 | 2/21/2013 1:24:08 PM | | DONE |
|
|
|
BLD06-02323
| FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 1:19:41 PM | A | PART |
|
|
Building #2 suite 104 passed final fire life safety inspection.
|
FIR06-00331
| INSP-Final Inspection | 2/19/2013 | 2/21/2013 | 2/21/2013 1:17:51 PM | A | NH |
|
|
needs at 8am before the restaurant opens//Don ###-#### Inspectors NOTE * (Arrived on site at 8:00 AM- contractor and owner both absent, doors locked and lights off. Phoned contractor twice and left a message- waited 15 min. To be rescheduled).*
|
BLD05-00128
| FIRE-Conference | 2/19/2013 | 2/21/2013 | 2/21/2013 1:13:39 PM | A | DONE |
|
|
On site conference with contractor regarding project related fire alarm and sprinkler trade work, finish schedule, plan review, conditions for occupancy, IFC and NFPA requirements.
|
BLD12-02915
| FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 1:09:58 PM | A | FAIL |
|
|
Modifications to the fire alarm system will be necessary due to remodel work (FIR permit required). Remainder of fire life safety inspection items passed.
|
BLD12-03325
| FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 1:03:35 PM | A | PASS |
|
|
Fire life safety completed satisfactory.
|
FIR13-00041
| INSP-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 1:01:06 PM | A | PASS |
|
|
Fire alarm permit work passed functional testing. Permit final okay.
|
FIR13-00019
| INSP-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 12:59:13 PM | A | PASS |
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
BLD12-03052
| FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 12:55:42 PM | A | PASS |
|
|
Previous correction notice items verified for completion. Life safety final approved pending repair of new hardware at the right hand freezer door. K-class PFE needs to be attatched to the wall as discussed. These items to be finished prior to structural final inspection.
|
FIR12-00709
| INSP-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 12:51:54 PM | A | PASS |
|
|
Scope of fire sprinkler work completed. Final inspection passed.
|