FIR13-00011
| INSP-Sprinkler Rough-in | 3/20/2013 | 3/21/2013 | 3/22/2013 6:00:11 PM | A | PART |
|
|
Shell work at the 9th, 10th, and 11th floors inspected today- noted items include overspaced head at the 9th floor restroom, ssu at south duct needs adjustment, missing hangers at 11th floor arm-overs.
|
FIR13-00131
| INSP-Final Inspection | 3/21/2013 | 3/21/2013 | 3/22/2013 5:53:49 PM | P | NR |
|
|
Final pending relocation of one pendent head and field ceiling tile.
|
BLD13-00004
| FIRE-Conference | 3/21/2013 | 3/21/2013 | 3/22/2013 5:52:37 PM | P | DONE |
|
|
Regarding fire sprinkler coverage
|
BLD12-03060
| FIRE-Final Inspection | 3/21/2013 | 3/21/2013 | 3/22/2013 5:51:38 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR13-00131
| INSP-Sprinkler Rough-in | 3/21/2013 | 3/21/2013 | 3/21/2013 2:16:17 PM | P | PART |
|
|
Overhead fire sprinkler modifications are okay for cover. One pendent head at the NW corner is overspaced- can be relocated and verified at final insp.
|
FIR13-00106
| INSP-Sprinkler Rough-in | 3/20/2013 | 3/21/2013 | 3/21/2013 2:13:02 PM | A | PART |
|
|
Okay to cover overhead work at the drop ceilings.
|
FIR12-00705
| INSP-Final Inspection | 3/20/2013 | 3/21/2013 | 3/21/2013 2:11:36 PM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough. Final approved.
|
FIR11-00263
| FIR-Aging Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 7:57:25 AM | | PEND |
|
|
|
FIR11-00561
| FIR-Aging Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 7:56:39 AM | | DONE |
|
|
|
BLD13-00055
| FIRE-Final Inspection | 3/21/2013 | 3/21/2013 | 3/21/2013 7:49:17 AM | A | PASS |
|
|
Fire alarm work completed under FIR13-00123. Fire life safety passed.
|