FIR13-00661
| INSP-Final Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 4:27:52 PM | P | PASS |
|
|
Fire sprinkler permit work approved for final.
|
BLD13-01888
| FIRE-Final Inspection | 5/2/2014 | 5/5/2014 | 5/5/2014 3:45:48 PM | P | PASS |
|
|
For previous correction items listed per C. Hanson
|
FIR14-00197
| INSP-Sprinkler Rough-in/Hydro | 5/5/2014 | 5/5/2014 | 5/5/2014 2:23:47 PM | P | PART |
|
|
Overhead hydrostatic test of the new system main and branchlines passed. Also completed a preliminary rough-in of the new riser manifold, 6" main and 3" branchlines. Tie-ins, demo work, and heads in drop ceilings are not done at this time.
|
FIR14-00142
| INSP-Alarm Testing | 5/5/2014 | 5/5/2014 | 5/5/2014 12:23:16 PM | A | DONE |
|
|
Verified air flow measurements per HVAC contractor at the duct smoke detector using a Fluke 922 meter and pitot.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 5/5/2014 | 5/5/2014 | 5/5/2014 12:18:22 PM | A | PART |
|
|
Install at plan mod two sheets FP0.1- FP1 passed rough-in.
|
FIR14-00215
| INSP-Sprinkler Rough-in | 5/5/2014 | 5/5/2014 | 5/5/2014 12:12:23 PM | A | PART |
|
|
Regarding coverage adjustments due to light fixture relocations.
|