Inspections for the day of: Tuesday, August 19, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00281 INSP-Conference8/19/20148/19/20148/19/2014 4:51:27 PMPDONE
Regarding inspection schedule
FIR13-00663 INSP-Final Inspection8/19/20148/19/20148/19/2014 4:50:48 PMPPASS
Scope of work completed. Fire sprinkler permit finaled, inspection passed.
FIR14-00121 INSP-Final Inspection8/19/20148/19/20148/19/2014 4:49:34 PMPPASS
Walkthrough passed. Fire sprinkler permit finaled.
FIR14-00372 INSP-Conference8/19/20148/19/20148/19/2014 4:48:25 PMPDONE
Regarding project inspection and testing schedule.
FIR14-00345 INSP-Sprinkler Rough-in8/19/20148/19/20148/19/2014 4:47:24 PMPPART
Okay to cover overhead fire sprinkler work at areas marked and dated on plans. Five heads at the north hall will need relocated due to cable tray obstructions, the break area south end is not yet finished- discussed light fixture obstructions at this area.
FIR14-00231 INSP-Final Inspection8/19/20148/19/20148/19/2014 2:13:43 PMPPASS
Record drawings accepted. Fire sprinkler work passed final inspection. Permit finaled.
FIR14-00130 INSP-Final Inspection8/19/20148/19/20148/19/2014 2:09:49 PMPPASS
Verified plan modification, final walkthrough passed inspection. Permit finaled.
FIR14-00261 INSP-Sprinkler Rough-in/Hydro8/19/20148/19/20148/19/2014 1:50:20 PMAPART
Inspection for standpipe completed. Need to provide seismic clearance at floor landings, install guage at the top level.
BLD14-01981 FIRE-Sprinkler Rough-in8/19/20148/19/20148/19/2014 1:40:34 PMAPART
Fire sprinkler modifications okayed for cover.
FIR14-00325 INSP-Sprinkler Rough-in/Hydro8/18/20148/19/20148/19/2014 1:37:43 PMAPART
UG fire supply line passed hydrostatic testing.