BLD13-01758
| FIRE-Final Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 5:08:13 PM | P | PASS |
|
|
Previous correction items verified for completion. Fire life safety inspection passed.
|
FIR13-00388
| INSP-Final Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 5:06:18 PM | P | PASS |
|
|
Scope of work finished. Both rough-in and final inspections completed. Fire sprinkler permit finaled.
|
FIR13-00299
| INSP-Sprinkler Rough-in/Hydro | 8/8/2013 | 8/9/2013 | 8/9/2013 5:04:38 PM | P | PART |
|
|
OH hydrostatic testing for the new system additions completed satisfactory. Also completed rough-in inspection.
|
FIR13-00297
| INSP-Final Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 3:25:31 PM | P | PASS |
|
|
Final inspection passed. Fire sprinkler permit finaled.
|
FIR13-00204
| INSP-Sprinkler Rough-in/Hydro | 8/8/2013 | 8/9/2013 | 8/9/2013 3:23:09 PM | P | NR |
|
|
Hydrostatic test incompleted due to system leakage in need of repair.
|
FIR13-00268
| INSP-Final Inspection | 8/6/2013 | 8/9/2013 | 8/9/2013 3:21:10 PM | A | FAIL |
|
|
Completed initial walkthrough. Items noted include; provide a MP at stairway #2 second floor exit door, visual notification at ADA rooms to meet guidelines per NFPA 72 table 18.5.4.6.2, adjust cd settings at notification appliances in mech. room 130 and facilities room 137, post signage at the door leading to the FACP per review note #25, post points map including location of the CO detectors, relocate HD at the elevator machine room, provide for shunt trip and include revision on operations matrix. Functional testing pending corrections and adjustments.
|
FIR08-00368
| FIR-Aging Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 3:08:12 PM | | PEND |
|
|
|
FIR08-00387
| FIR-Aging Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 3:07:18 PM | | PEND |
|
|
|
FIR08-00825
| FIR-Aging Inspection | 8/9/2013 | 8/9/2013 | 8/9/2013 3:06:54 PM | | PEND |
|
|
|
FIR13-00268
| FIR-Aging Inspection | 8/6/2013 | 8/9/2013 | 8/9/2013 3:04:43 PM | A | DONE |
|
|
Duplicate inspection request
|
FIR13-00334
| INSP-Final Inspection | 8/8/2013 | 8/9/2013 | 8/9/2013 3:03:28 PM | A | PASS |
|
|
Hood suppression system operated correctly under test conditions. Permit finaled.
|
FIR13-00037
| INSP-Sprinkler Rough-in/Hydro | 8/7/2013 | 8/9/2013 | 8/9/2013 3:02:22 PM | A | PART |
|
|
Overhead hydrostatic test for the first and second floor wet systems passed.
|
FIR13-00288
| INSP-Sprinkler Rough-in | 8/8/2013 | 8/9/2013 | 8/9/2013 2:45:51 PM | A | PART |
|
|
Okay to cover overhead fire sprinkler work at project "phase one" as annotated and initialed on stamped plans.
|