FIR11-00532
| FIR-Aging Inspection | 9/11/2012 | 9/11/2012 | 9/13/2012 11:17:09 AM | | DONE |
|
|
Permit work completed.
|
FIR11-00458
| FIR-Aging Inspection | 9/11/2012 | 9/11/2012 | 9/13/2012 11:12:46 AM | | FAIL |
|
|
|
BLD12-02120
| FIRE-Final Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 5:21:47 PM | P | PASS |
|
|
Life safety okayed pending the fire extinguisher is provided with a current annual certification- to be verified by the structural inspector at final per discussion with tenant.
|
FIR11-00561
| FIR-Aging Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 5:06:04 PM | | DONE |
|
|
|
FIR12-00470
| INSP-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 3:46:20 PM | P | PART |
|
|
Overhead fire sprinkler work approved for cover at the new drop ceilings. Final pending tile and escutcheons.
|
FIR12-00461
| INSP-Final Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 3:44:17 PM | P | PASS |
|
|
Hood suppression system operated correctly under test conditions.
|
FIR12-00437
| INSP-Sprinkler Rough-in | 9/11/2012 | 9/11/2012 | 9/11/2012 3:42:58 PM | P | PART |
|
|
Scope of work at the grid ceilings approved for cover. Verified cooler temps to remain no lower than 40 deg. per conversation with the tenant on site.
|
FIR12-00246
| INSP-Sprinkler Rough-in | 9/10/2012 | 9/11/2012 | 9/11/2012 1:04:23 PM | A | PART |
|
|
Pendent heads at the nurse station 135 sheetrock ceiling are approved for cover.
|
FIR12-00479
| INSP-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 1:02:53 PM | A | PART |
|
|
Okay to cover fire sprinkler modifications per the scope of work.
|
BLD12-00295
| FIRE-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 1:01:18 PM | A | PASS |
|
|
Fire life safety inspection passed.
|