Inspections for the day of: Friday, October 18, 2019.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorChad Schwendiman
TitleMEC-INSPECTOR
Phone #780-9549
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00319 DOC - Permit Finaled10/18/201910/18/201910/18/2019 10:41:29 AMAPASS
MIS19-00319 MEC-Conference10/15/201910/18/201910/18/2019 10:41:00 AMAPASS
Meet at 10:00 - Met onsite with The genral manager. They had the PTAC unit pulled out so I could see that they did in fact disable the fresh air intake on the unit. With this being done the installation is in full compliance with the Code that this building was constructed under and the Boiler manufactures installation instructions for venting. I strongly suggested they still add a carbon monoxide sensor to the room just as an extra safty measure. They said they would still take it under consideration.
MIS19-00263 DOC - Permit Finaled10/18/201910/18/201910/18/2019 9:19:05 AMAPASS
Mechanical permit was pulled for piping