MEC19-03993
| Final | 11/21/2019 | 11/21/2019 | 11/21/2019 4:10:36 PM | P | PART |
|
|
Tom Bratcher will be on-site to go over inspection with mechanical inspector. Thank You Phone #: ###-#### Inspection requested via web by Tom Bratcher - Temporary occupancy okay. Need to patch aramflex in east side mechanical room, Need email from Air balancer stating economizer is fuctioning per engineers design.
|
MEC19-05279
| Pressure Test | 11/21/2019 | 11/21/2019 | 11/21/2019 2:57:27 PM | P | NR |
|
|
as late as possible // Kevin Phone #: ###-#### - Not ready
|
MEC19-04791
| Pressure Test | 11/21/2019 | 11/21/2019 | 11/21/2019 2:42:09 PM | P | PASS |
|
|
Dale Phone #: ###-#### - 20lb gas pass.
|
MEC19-01679
| Rough-in | 11/20/2019 | 11/21/2019 | 11/21/2019 2:36:32 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Signed okay to cover some hard lids on the mechanical plans
|