MEC17-04433
| Final | 7/11/2018 | 7/12/2018 | 7/12/2018 1:31:43 PM | A | FAIL |
|
|
John Phone #: ###-#### 1) Need to seal return duct in kitchen 2) Need to complete fire wrap on grease duct ( needs to be done by a certified individual). 3) Grease drain needs to be ran in Black iron, stainless steel, or copper. 4) Need to complete vent terminations on outside of building 5) Pool heater vents need to be installed per manufactures instructions. 6) Need to support duct at canvas connector on dehumidification unit. 7) Need final air balance report 8) Need to install intake hood on MAU for 1st floor 9) Need to protect insulation on outside duct for MAU 1st floor
|
MEC18-03349
| Pressure Test | 7/12/2018 | 7/12/2018 | 7/12/2018 12:43:02 PM | P | CANC |
|
|
please call our lead installer Brad when 30 mins in route. End of day would be preferred, 3-5p if possible. Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|
MEC18-02944
| Rough-in | 7/12/2018 | 7/12/2018 | 7/12/2018 11:30:39 AM | A | PASS |
|
|
|
MEC18-01895
| Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 11:30:21 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Okay to insulate supply duct in 2nd, and 3rd floor bathrooms
|
MEC18-02283
| Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 11:30:21 AM | A | PART |
|
|
5th floor cover please Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN - Okay to cover hard lid drop ceilings in units 502, 503, 504, 505, 506, 507, 508, 510, 511, 517, 519. Okay to cover bottom of TGI's and walls in unit 314
|