MEC18-03819
| Rough-in | 8/17/2018 | 8/17/2018 | 8/17/2018 3:26:32 PM | P | PASS |
|
|
Rough-In Inspections for the Vestibule AHU. Please contact Joey Hickman with any questions or access at ###-####. Phone #: ###-#### Inspection requested via web by Joshua Bennett - Okay to cover entry way ceiling
|
MEC18-00852
| Pressure Test | 8/16/2018 | 8/17/2018 | 8/17/2018 10:22:39 AM | A | PASS |
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60LB gas pass for whole piping system. Need to verify that blocks are secured to the piping at final, and gas piping is supported up off the roof at unit heater location
|
MEC18-03970
| Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 9:32:08 AM | A | FAIL |
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need to seal the top of the square duct.
|
MEC18-03809
| Pressure Test | 8/16/2018 | 8/17/2018 | 8/17/2018 9:03:41 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - Flue pressure test on water heater not holding presusure
|
MEC18-03809
| Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 9:03:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|