ELE09-01131
| Final | 7/9/2009 | 7/10/2009 | 7/10/2009 4:50:43 PM | P | PASS |
|
|
Heather Phone #: ###-####. Ok final
|
ELE09-01198
| Electrical Rough-In | 7/10/2009 | 7/10/2009 | 7/10/2009 4:11:58 PM | P | PASS |
|
|
cheri-please call at least 30 mins prior and if no answer when you get there please go around to the side gate or alley gate Phone #: ###-####. ok to cover ceilings on rear porches.
|
ELE09-00348
| Final | 7/9/2009 | 7/10/2009 | 7/10/2009 2:43:46 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rhonda Yoast. Ok final
|
ESC09-00059
| General Inspection | 7/10/2009 | 7/10/2009 | 7/10/2009 2:43:07 PM | P | PASS |
|
|
Sign posted. Site looks good.
|
ESC09-00059
| Site Preparation | 7/10/2009 | 7/10/2009 | 7/10/2009 2:40:15 PM | P | CANC |
|
|
|
ELE08-03055
| Electrical Rough-In | 7/9/2009 | 7/10/2009 | 7/10/2009 1:29:40 PM | A | PASS |
|
|
Unit 546. Jim is the contact his number is ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shawna Gates. Ok to cover walls. Vebal survey to Jim to add a few nail plates.
|
ELE09-00711
| Electrical Rough-In | 7/9/2009 | 7/10/2009 | 7/10/2009 1:01:55 PM | A | PART |
|
|
Please call to meet in main hospital lobby. Cell ###-#### Desk ###-#### Phone #: ###-#### Internet Inspection Request from: mark morris. Ok to cover cath lab walls 3rd floor.
|
ELE09-01180
| Final | 7/10/2009 | 7/10/2009 | 7/10/2009 12:01:21 PM | P | PASS |
|
|
ok final.
|
ELE09-00696
| Final | 7/10/2009 | 7/10/2009 | 7/10/2009 10:59:19 AM | A | PASS |
|
|
Call Jason if there are any problems or questions Phone #: ###-#### Internet Inspection Request from: Kevin Blackmon.ok final
|
ELE09-01221
| Electrical Rough-In | 7/9/2009 | 7/10/2009 | 7/10/2009 10:18:24 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot. Ok to cover walls. Called and notified to make sure that they don't strap M.C cable to other conduits for support. NEC 300.11 B@C
|
ELE08-03279
| Final | 7/9/2009 | 7/10/2009 | 7/10/2009 9:46:15 AM | A | PASS |
|
|
Contact: Neil Ramsey Phone #: ###-#### Internet Inspection Request from: Deb Gooden. Ok final
|
ELE09-01229
| Permanent Service | 7/9/2009 | 7/10/2009 | 7/10/2009 9:18:30 AM | A | PASS |
|
|
Joe Phone #: ###-####- call 30 mins prior to going. Ok perm sevice. Verbal survey to Joe to change metal romex connectors on grounds to plastic.
|
ELE09-01203
| Final | 7/9/2009 | 7/10/2009 | 7/10/2009 8:42:49 AM | A | PASS |
|
|
please inspect hot tub. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS. Hot tub UL listed everything looked good.
|
ELE09-00655
| Electrical Rough-In | 7/7/2009 | 7/10/2009 | 7/10/2009 8:06:39 AM | A | PASS |
|
|
Hawk Phone #: ###-####. Ok to cover
|
ELE08-00519
| Final | 7/10/2009 | 7/10/2009 | 7/10/2009 7:49:18 AM | P | CANC |
|
|
Final Inspection on Condo units #602 and 201 thru 209 and Final on whole building. Please call Bill 30 min. in advance. Phone #: ###-#### Internet Inspection Request from: Alan Lusk Inspection cancelled from web by: Alan Lusk
|