BLD17-03011
| BLD-Final | 1/24/2019 | 1/24/2019 | | P | |
|
|
see PW notes dated 10/27/17. if questions call dianne ###-#### ex. 2
|
BLD17-03011
| BLD-Conference | 1/27/2019 | 1/28/2019 | | A | |
|
|
see PW notes dated 10/27/17. if questions call dianne ###-#### ex. 2
|
BLD18-01896
| BLD-Aging Inspection | 1/31/2019 | 1/31/2019 | 2/8/2019 3:32:15 PM | | PEND |
|
|
|
BLD18-03116
| BLD-Foundation | 1/30/2019 | 1/31/2019 | 2/1/2019 9:31:21 AM | P | PART |
|
|
Dane Phone #: ###-####
|
BLD18-04468
| BLD-Wall Bracing | 1/30/2019 | 1/31/2019 | 1/31/2019 4:01:39 PM | P | PART |
|
|
Concrete at 1:30 pm // Brandon Phone #: ###-####,, foundation poured,, ok
|
BLD18-04106
| BLD-Wall Bracing | 1/31/2019 | 1/31/2019 | 1/31/2019 4:00:46 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, need to re-nail some areas
|
BLD18-03483
| BLD-Framing/Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 3:55:33 PM | P | PASS |
|
|
Bryan Phone #: ###-####,, ok to insulate
|
BLD18-03584
| BLD-Framing/Rough-in | 1/31/2019 | 1/31/2019 | 1/31/2019 3:00:11 PM | P | PASS |
|
|
Casee Phone #: ###-####,, ok to insulate
|
BLD18-03119
| BLD-Conference | 1/31/2019 | 1/31/2019 | 1/31/2019 2:58:36 PM | A | PART |
|
|
Hey Tony- just want to go through some things with you. Please call when you’re headed my way. Thanks much. Phone #: ###-#### Inspection requested via web by Brad Christensen/// walk through on frame
|
BLD17-03809
| BLD-Final | 1/29/2019 | 1/31/2019 | 1/31/2019 1:59:04 PM | P | PASS |
|
|
Call 20 minutes ahead Phone #:###-####
|
BLD17-03809
| DOC - Permit Finaled | 1/31/2019 | 1/31/2019 | 1/31/2019 1:57:44 PM | P | PASS |
|
|
|
BLD18-03274
| BLD-Final | 1/30/2019 | 1/31/2019 | 1/31/2019 1:56:40 PM | P | NR |
|
|
Dustin Phone #: ###-####,, needsv historical,, address needs posted
|
BLD18-01115
| BLD-Final | 1/30/2019 | 1/31/2019 | 1/31/2019 1:15:37 PM | A | NR |
|
|
Jake-please call for access Phone #: ###-####,, needs trades,, and blower door test results,, tempered glass in dining near the door
|
BLD18-04116
| BLD-Wall Bracing | 1/30/2019 | 1/31/2019 | 1/31/2019 12:26:17 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, later am
|
BLD19-00296
| BLD-Footing | 1/30/2019 | 1/31/2019 | 1/31/2019 12:06:29 PM | A | PART |
|
|
Jack Phone #: ###-####,, work in progress
|
BLD19-00174
| BLD-Framing/Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 11:54:58 AM | A | PASS |
|
|
Keith-1 post Phone #: ###-####-please call 10 minutes prior to meet for access,, beam ok
|
BLD19-00174
| BLD-Footing | 1/30/2019 | 1/31/2019 | 1/31/2019 11:54:32 AM | A | PASS |
|
|
Keith-1 post Phone #: ###-####-please call 10 minutes prior to meet for access,, interior footing for a beam load
|