MIS19-00002
| BLD-Conference | 1/4/2019 | 1/8/2019 | 1/11/2019 1:02:40 PM | A | PEND |
|
|
Caller stated shower/tub and kitchen have been added into the space// status review
|
BLD18-02203
| BLD-Aging Inspection | 1/8/2019 | 1/8/2019 | 1/9/2019 1:47:08 PM | | PEND |
|
|
|
BLD17-04214
| BLD-Final | 1/8/2019 | 1/8/2019 | 1/8/2019 6:19:47 PM | P | PEND |
|
|
|
BLD18-04530
| BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 6:18:06 PM | P | NR |
|
|
Tim Phone #: ###-####,, no inspection made,, needs f/l/s 1st
|
BLD18-04128
| BLD-Footing | 1/8/2019 | 1/8/2019 | 1/8/2019 3:28:50 PM | P | NR |
|
|
Greg Phone #: ###-####,, needs soils approval 1st
|
BLD18-02893
| BLD-Wall Bracing | 1/8/2019 | 1/8/2019 | 1/8/2019 3:18:35 PM | P | NR |
|
|
shear // Justin Phone #: ###-####,, need portal frames
|
BLD18-01845
| BLD-Energy code compliance | 1/8/2019 | 1/8/2019 | 1/8/2019 2:01:15 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson// needs fire blocking at top of main floor chase,, then ok
|
BLD18-03228
| BLD-Framing/Rough-in | 1/8/2019 | 1/8/2019 | 1/8/2019 1:59:58 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson,, needs to verify rim joist insulation at garage warm wall,, strap beam/platre upstairs hall,, ok to insulate
|
BLD18-02343
| BLD-Framing/Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 12:15:54 PM | A | NR |
|
|
Robert Phone #: ###-####,, needs seal package
|
BLD18-00034
| DOC - Permit Expired | 11/26/2018 | 1/8/2019 | 1/8/2019 11:41:15 AM | A | PASS |
|
|
|
BLD18-04374
| BLD-Footing | 1/7/2019 | 1/8/2019 | 1/8/2019 11:24:04 AM | A | PASS |
|
|
Stem wall inspection prior to concrete. Phone #: ###-#### Inspection requested via web by Dustin Collins
|
BLD17-01000
| BLD-Conference | 1/3/2019 | 1/8/2019 | 1/8/2019 11:14:49 AM | A | PART |
|
|
Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####,, ?s about a final
|