Inspections for the day of: Tuesday, October 15, 2019.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04250 BLD-Aging Inspection10/15/201910/15/201910/21/2019 11:19:44 AM PEND
BLD18-04325 BLD-Aging Inspection10/15/201910/15/201910/21/2019 11:18:15 AM PEND
MIS19-00333 BLD-Conference10/11/201910/15/201910/16/2019 4:17:03 PMPPEND
status review,, c/n posted to follow through with the permit
BLD19-02593 BLD-Wall cover10/15/201910/15/201910/15/2019 4:57:27 PMPPASS
Exterior soffit 1hr rating sheetrock periodic inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen// east soffit has 2 layers,, ok
BLD18-04214 BLD-Framing/Rough-in10/14/201910/15/201910/15/2019 4:32:47 PMPFAIL
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel,, c/n posted,, needs fireplace pass, seal package, plans, truss engineering prior to frame
BLD19-03973 BLD-Conference10/15/201910/15/201910/15/2019 4:11:44 PMPPASS
Phone #: ###-#### Inspection requested via web by Jeff Ware,, stair conf.,, ok
BLD19-00036 BLD-Foundation10/15/201910/15/201910/15/2019 2:47:55 PMPPART
Phone #: ###-#### Inspection requested via web by Trent Howie,, basement walls ok to pour when ready
BLD19-03053 BLD-Conference10/15/201910/15/201910/15/2019 2:47:07 PMPDONE
Ryan Phone #: ###-####,, A-35s on blocks ok
BLD19-03615 DOC - Permit Finaled10/15/201910/15/201910/15/2019 2:45:18 PMPPASS
historical not needed per T.V.
BLD19-03096 BLD-Final10/14/201910/15/201910/15/2019 2:44:13 PMPDONE
Phone #: ###-#### Inspection requested via web by Kilee Russell
BLD19-03096 DOC - Permit Finaled10/15/201910/15/201910/15/2019 2:04:26 PMPPASS
done
BLD18-02746 BLD-Framing/Rough-in10/14/201910/15/201910/15/2019 1:58:45 PMAPASS
Josh Phone #: ###-####,, ok to insulate
BLD19-02292 DOC - Permit Finaled10/15/201910/15/201910/15/2019 1:31:55 PMPPASS
BLD19-03377 BLD-Footing10/14/201910/15/201910/15/2019 12:33:33 PMAPART
Footing will be ready for inspection at 11 am
Concrete schedule for 1 pm Phone #: ###-#### Inspection requested via web by Edgar Sanchez.. work in progress,, ok to pour when ready
BLD19-02225 BLD-Ceiling Grid Inspection10/14/201910/15/201910/15/2019 12:15:18 PMAPART
Dale Phone #: ###-####, existing grid, , ok after trades,,
BLD19-02311 BLD-Framing/Rough-in10/14/201910/15/201910/15/2019 11:14:58 AMAPART
Dan Phone #: ###-####,, ok to insulate after minor corrections
BLD19-02603 BLD-Framing/Rough-in10/14/201910/15/201910/15/2019 11:13:06 AMAPASS
Dave Phone #: ###-####,, grid ok
BLD19-02591 BLD-Energy code compliance10/14/201910/15/201910/15/2019 9:45:47 AMAPASS
Exterior wall insulation inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD19-02590 BLD-Energy code compliance10/14/201910/15/201910/15/2019 9:45:19 AMAPASS
Exterior wall insulation inspection. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD19-02593 BLD-Energy code compliance10/14/201910/15/201910/15/2019 9:45:06 AMAPASS
Wall insulation inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
BLD19-02592 BLD-Energy code compliance10/14/201910/15/201910/15/2019 9:44:34 AMAPASS
Wall insulation inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen