Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00297 MIS-Aging Inspection11/15/201811/15/201811/16/2018 12:47:24 PM PEND
MIS18-00431 BLD-Conference11/14/201811/15/201811/15/2018 5:04:19 PMPNH
complaint doing major TI work at building. Possible started work on BLD18-00133 that is not issued yet./// status review
BLD18-03499 BLD-Footing11/14/201811/15/201811/15/2018 5:03:27 PMAPART
John Phone #: ###-####,, work in progress
BLD18-03228 BLD-Conference11/14/201811/15/201811/15/2018 4:42:02 PMPPART
Gene Phone #: ###-####,, walk through to look at all the engineering,, ok so far,, work in progress
BLD18-02746 BLD-Conference11/13/201811/15/201811/15/2018 2:45:31 PMPPART
early as poss in PM // call when on way to meet // Josh Mitchell Phone #: ###-####,, exterior stair ?s,, retaining wall ?s,, need to follow engineering
BLD18-03473 BLD-Wall Bracing11/15/201811/15/201811/15/2018 2:41:19 PMPPASS
Kevin Phone #: ###-####,, exterior ok after minor fixes
BLD18-03790 BLD-Footing11/15/201811/15/201811/15/2018 2:40:17 PMPPART
Colbi Phone #: ###-####,, ok after adding rebar per plan
BLD18-04130 BLD-Final11/15/201811/15/201811/15/2018 2:38:57 PMPDONE
Robert Phone #: ###-####
BLD18-04130 DOC - Permit Finaled11/15/201811/15/201811/15/2018 2:04:50 PMPPASS
done
BLD18-01798 BLD-Framing/Rough-in11/15/201811/15/201811/15/2018 2:01:48 PMPPASS
Mark Phone #: ###-####,, issues made ok,, andded tar/felt paper between concrete and plate,, ok to insulate
BLD18-04016 BLD-Footing11/14/201811/15/201811/15/2018 12:01:55 PMAPASS
Andy Phone #: ###-####,, deck footings ok
BLD18-02613 BLD-Final11/14/201811/15/201811/15/2018 11:21:35 AMANR
Greg Phone #: ###-####,, needs electrical 1st
BLD18-02558 BLD-Wall Bracing11/14/201811/15/201811/15/2018 10:44:22 AMAPASS
call Dennis, framer Phone #: ###-#### Inspection requested via web by Andrina Davis
BLD15-01463 BLD-Framing/Rough-in11/14/201811/15/201811/15/2018 10:21:07 AMAPASS