BLD17-04398
| BLD-Aging Inspection | 11/26/2018 | 11/26/2018 | 12/3/2018 8:15:44 AM | | PEND |
|
|
|
BLD18-03756
| BLD-Conference | 11/26/2018 | 11/26/2018 | 11/27/2018 6:30:53 AM | P | PASS |
|
|
Brett Phone #: ###-####.. floor jist connection ?s
|
BLD18-02182
| BLD-Footing | 11/26/2018 | 11/26/2018 | 11/26/2018 3:52:49 PM | P | PASS |
|
|
vali Phone #: ###-####
|
BLD18-00318
| BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 3:34:07 PM | P | FAIL |
|
|
clayton Phone #: ###-####,, needs.. address, hillside from public works,, tempered glass in master bath,, mechanical permits passed,, fire caulking
|
BLD18-01531
| BLD-Blower Door Test Results | 11/26/2018 | 11/26/2018 | 11/26/2018 3:32:30 PM | P | PASS |
|
|
Phone #: ###-####/// 2.9
|
BLD18-01531
| DOC - Permit Finaled | 11/26/2018 | 11/26/2018 | 11/26/2018 3:32:22 PM | P | PASS |
|
|
|
BLD18-01531
| BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 3:31:41 PM | P | PASS |
|
|
Phone #: ###-####
|
BLD17-04693
| BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 3:31:16 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD17-01583
| BLD-Wall cover | 11/26/2018 | 11/26/2018 | 11/26/2018 1:53:21 PM | P | PASS |
|
|
Partial framing for soffit cover. Wanting to cover all exterior soffits and overhangs before full framing. Plans and engineering under stairs. Call Andy with any questions Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD17-02040
| BLD-Foundation | 11/20/2018 | 11/26/2018 | 11/26/2018 12:46:31 PM | A | PART |
|
|
Monica-retaining wall and pool vault wall Phone #: ###-####,, work in progress,, ok
|
BLD18-03119
| BLD-Foundation | 11/21/2018 | 11/26/2018 | 11/26/2018 11:33:13 AM | A | PASS |
|
|
Brad Phone #: ###-####
|
BLD18-03249
| BLD-Footing | 11/20/2018 | 11/26/2018 | 11/26/2018 11:13:50 AM | A | PART |
|
|
As early as possible Phone #: 2088616923 >> Inspection requested via mobile web by Fabian Noel,, upper retaining wall ok
|