Inspections for the day of: Monday, December 23, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03725 BLD-Aging Inspection12/23/201912/23/201912/26/2019 2:13:09 PM PEND
BLD19-03575 BLD-Final12/19/201912/23/201912/23/2019 4:33:06 PMPNR
Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope
BLD19-02406 BLD-Concrete12/23/201912/23/201912/23/2019 4:32:49 PMPPEND
This inspection is for Slab preparation to include welded wire and thickened opening pour throughs. Will be ready by 3:00 pm today. MTI will be inspecting and observing placement at 6:00 am Tomorrow.

Thank You, have a great day. Phone #: ###-#### Inspection requested via web by Ron Oswald// slab area ok when ready after raising rebar// pending special inspection
BLD19-02849 BLD-Conference12/23/201912/23/201912/23/2019 4:10:09 PMPPEND
verify rear setbacks,, measures 15 foot from wood frame to existing fence sent photos to Tom in Code enforcement
BLD19-01860 BLD-Energy code compliance12/20/201912/23/201912/23/2019 3:22:22 PMPPASS
Craig Phone #: ###-####,, will need interior shear inspection,, ok to cover after adding truss brace where cut out
BLD19-01860 BLD-Framing/Rough-in12/20/201912/23/201912/23/2019 3:21:23 PMPPART
Craig Phone #: ###-####,, needs truss brace added that was cut out at the top of stairs,, will need interior shear inspection also
BLD19-03053 BLD-Framing/Rough-in12/23/201912/23/201912/23/2019 2:20:38 PMPPART
Ryan - call for access Phone #: ###-####// ok to insulate,, see paint for c/n,, fire block,, insulate rim areas,, headroom on the stairs, etc
BLD19-03485 BLD-Foundation12/20/201912/23/201912/23/2019 12:39:36 PMAPART
Austin Phone #: ###-####// upper level of home footings
BLD19-03484 BLD-Foundation12/20/201912/23/201912/23/2019 12:39:21 PMAPART
Austin Phone #: ###-####// upper level of home footings
BLD19-03483 BLD-Foundation12/20/201912/23/201912/23/2019 12:39:09 PMAPART
Austin Phone #: ###-####// upper level of home footings
BLD19-03482 BLD-Foundation12/20/201912/23/201912/23/2019 12:38:54 PMAPART
Austin Phone #: ###-####.. upper level of home footings
BLD19-04362 BLD-Footing12/19/201912/23/201912/23/2019 12:36:47 PMAPART
Curtis Phone #: ###-####,, main footings ok except the east retaining wall footing,, engineering changed,, need to redo per newer engineering
BLD19-03085 BLD-Wall Bracing12/20/201912/23/201912/23/2019 11:29:26 AMAPASS
Larry Phone #: ###-####,, exterior ok after adding minor nailing and finishing straps
BLD18-03249 BLD-Conference12/20/201912/23/201912/23/2019 11:05:14 AMAPART
Fabian Phone #: ###-####,, walk through on the final,, needs hillside PW pass,, needs guard rail and hand rail to meet code,, needs fire seperation in the garage..