Inspections for the day of: Tuesday, December 4, 2018.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00188 BLD-Aging Inspection12/4/201812/4/201812/7/2018 10:04:33 AM PEND
BLD17-04248 BLD-Final12/4/201812/4/201812/5/2018 3:09:21 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
BLD17-04249 BLD-Final12/4/201812/4/201812/5/2018 3:08:58 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchellll// needs trades,, road sign
BLD17-04247 BLD-Final12/4/201812/4/201812/5/2018 3:08:37 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
BLD17-04250 BLD-Final12/4/201812/4/201812/5/2018 3:08:10 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
BLD17-04246 BLD-Final12/4/201812/4/201812/5/2018 3:07:31 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
BLD17-04251 BLD-Final12/4/201812/4/201812/5/2018 3:07:05 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs trades, road name
BLD17-04252 BLD-Final12/4/201812/4/201812/5/2018 3:06:31 PMPNR
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs trades
BLD17-03490 BLD-Final12/3/201812/4/201812/4/2018 4:32:01 PMPPART
Steve Phone #: ###-####,, ok,, just needs blower door test results
BLD18-03521 BLD-Wall Bracing12/3/201812/4/201812/4/2018 3:30:25 PMPPASS
Jeff Phone #: ###-####
BLD17-03394 BLD-Framing/Rough-in12/4/201812/4/201812/4/2018 3:08:37 PMPPART
Tim Phone #: ###-####,, needs fire blocking, seal plates.. nail hangers off,, ok to insulate
BLD18-01298 BLD-Final12/4/201812/4/201812/4/2018 2:36:55 PMPPART
Call for access- Steve Phone #: ###-####// needs the blower door test results,, vent wells on exterior or redo the landscape,, firecaulk t-stat wire
BLD18-00887 BLD-Ceiling Grid Inspection12/4/201812/4/201812/4/2018 1:58:26 PMPPASS
request for ceiling grid inspection @ basement Fellowship room.

Best access from alley down rear stairs to basement. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band// ok pending trades
BLD18-02396 BLD-Conference11/30/201812/4/201812/4/2018 1:49:33 PMAPART
Jay Phone #: ###-####,, new contractor taking over job,, walk through,, I recommended having the structural engineer walk the job to verify and/or give fixes of any issues
BLD18-00998 BLD-Framing/Rough-in12/3/201812/4/201812/4/2018 12:28:23 PMAPART
jeff Phone #: ###-####,, corrections painted,, ok to insulate
BLD18-01502 BLD-Framing/Rough-in12/3/201812/4/201812/4/2018 11:39:00 AMAPART
David Phone #: ###-####,, painted corrections,, straps, bearing, fire blocks, truss brace overlapping
BLD18-01502 BLD-Wall Bracing12/3/201812/4/201812/4/2018 11:37:31 AMAPASS
David Phone #: ###-####
BLD18-01798 BLD-Energy code compliance12/3/201812/4/201812/4/2018 10:48:36 AMAPASS
Mark Phone #: ###-####
BLD18-02775 BLD-Footing12/3/201812/4/201812/4/2018 10:38:15 AMAFAIL
Victor Phone #: ###-####,, ground is frozen
BLD18-01322 BLD-Blower Door Test Results12/4/201812/4/201812/4/2018 10:29:12 AMPDONE
2.7
BLD18-01322 BLD-Final12/3/201812/4/201812/4/2018 10:23:15 AMAPASS
Phone #: ###-#### Inspection requested via web by Nancy Frost
BLD18-01322 DOC - Permit Finaled12/4/201812/4/201812/4/2018 10:23:08 AMPPASS
c of o issued
BLD18-00204 BLD-Energy code compliance12/3/201812/4/201812/4/2018 9:37:39 AMAPASS
Ron Phone #: ###-####
BLD18-02937 BLD-Conference12/3/201812/4/201812/4/2018 9:37:11 AMAPART
Kerry Phone #: ###-####,, ?s on wall height
BLD18-01701 BLD-Final12/4/201812/4/201812/4/2018 7:23:18 AMPCANC
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy