BLD19-01006
| BLD-Aging Inspection | 2/14/2020 | 2/14/2020 | 2/19/2020 12:54:37 PM | | DONE |
|
|
|
BLD19-00043
| BLD-Conference | 2/14/2020 | 2/14/2020 | 2/18/2020 1:40:54 PM | P | PEND |
|
|
neighbor concerns,, status review// owner said he would get back on it
|
BLD19-03440
| BLD-Foundation | 2/14/2020 | 2/14/2020 | 2/14/2020 4:58:39 PM | P | PART |
|
|
Wall // Ryan Phone #: ###-####
|
BLD19-04965
| BLD-Footing | 2/13/2020 | 2/14/2020 | 2/14/2020 4:51:00 PM | P | PART |
|
|
Pat Phone #: ###-####
|
BLD19-01828
| BLD-Other | 2/14/2020 | 2/14/2020 | 2/14/2020 4:49:53 PM | P | PASS |
|
|
Ceiling resilient channel install inspection 1st floor units. Late afternoon if possible. Phone #: ###-#### Inspection requested via web by Michael Zaccheo,, 2nd floor ok also
|
BLD19-04863
| BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 3:32:58 PM | P | DONE |
|
|
Call half hour before // Brandon Phone #: ###-####
|
BLD19-04863
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 3:32:36 PM | P | PASS |
|
|
|
BLD19-04846
| BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 3:31:54 PM | P | PART |
|
|
Call half hour before // Brandon Phone #: ###-####// ok to cover open ceiling area
|
MIS19-00100
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 3:11:22 PM | P | PASS |
|
|
|
BLD18-02974
| DOC - Permit Expired | 12/31/2019 | 2/14/2020 | 2/14/2020 3:06:25 PM | P | PASS |
|
|
|
BLD18-04507
| BLD-Final | 2/14/2020 | 2/14/2020 | 2/14/2020 3:05:29 PM | P | NR |
|
|
Call: PJ Smith on way to inspection. PJ Would like to walk through home with inspector, 208 559 0588
Have a great weekend!
PJ Phone #: ###-#### Inspection requested via web by PJ Smith// needs tempered glass,, blower door test results,, fire caulk,, landing,,
|
BLD19-03891
| BLD-Energy code compliance | 2/13/2020 | 2/14/2020 | 2/14/2020 2:29:05 PM | A | PASS |
|
|
Craig Phone #: ###-####
|
BLD19-03891
| BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 2:28:54 PM | A | PASS |
|
|
Craig Phone #: ###-####
|
BLD18-04371
| BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 2:28:41 PM | A | PART |
|
|
Charlie Phone #: ###-####// needs historical, smoke/carbon in hall,, then ok
|
BLD19-01854
| BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 2:26:59 PM | A | PASS |
|
|
Craig Phone #: ###-####
|
BLD19-01854
| DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 2:26:53 PM | P | PASS |
|
|
|
BLD19-01854
| BLD-Blower Door Test Results | 2/14/2020 | 2/14/2020 | 2/14/2020 2:26:40 PM | P | DONE |
|
|
Craig Phone #: ###-####// 3.98
|
BLD19-03330
| BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 12:45:09 PM | A | FAIL |
|
|
Dave Phone #: ###-####// correction notice posted,, point loads, truss bearing justification, seal firewall, strap plates/// do not insulate
|
BLD19-04953
| BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 11:54:55 AM | A | PART |
|
|
Pat Phone #: ###-####,, work in progress
|
BLD19-04894
| BLD-Framing/Rough-in | 2/13/2020 | 2/14/2020 | 2/14/2020 11:40:17 AM | A | PART |
|
|
Ben Phone #: ###-####,, ok to insulate and cover pending trades
|
BLD18-02930
| DOC - Permit Expired | 12/26/2019 | 2/14/2020 | 2/14/2020 10:58:14 AM | A | PASS |
|
|
|
BLD19-03440
| BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 10:55:30 AM | A | PART |
|
|
Pat Phone #: ###-####.. wip
|