BLD19-02587
| BLD-Aging Inspection | 2/19/2020 | 2/19/2020 | 2/20/2020 1:59:48 PM | | PEND |
|
|
|
BLD18-03168
| BLD-Aging Inspection | 2/19/2020 | 2/19/2020 | 2/20/2020 1:58:12 PM | | DONE |
|
|
|
BLD19-01089
| BLD-Aging Inspection | 2/19/2020 | 2/19/2020 | 2/20/2020 1:57:30 PM | | PEND |
|
|
|
BLD20-00036
| BLD-Framing/Rough-in | 2/19/2020 | 2/19/2020 | 2/20/2020 11:10:23 AM | P | PART |
|
|
Quint Phone #: ###-####,, walk through only,, needs trades 1st,, exterior ok to cover
|
BLD19-04108
| BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 3:18:23 PM | P | PASS |
|
|
Justin Phone #: ###-####
|
BLD19-03546
| BLD-Conference | 2/19/2020 | 2/19/2020 | 2/19/2020 2:47:44 PM | P | PASS |
|
|
meet framer/// frame issues ok
|
BLD19-03546
| BLD-Framing/Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 2:33:44 PM | P | PART |
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel// needs fire blocks x 3,, ok to insulate
|
BLD19-01828
| BLD-Other | 2/18/2020 | 2/19/2020 | 2/19/2020 2:11:25 PM | A | PART |
|
|
Two layer drywall install inspection 1st floor units. Phone #: ###-#### Inspection requested via web by Michael Zaccheo/// work in progress,, ok
|
BLD18-04248
| BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 1:46:16 PM | P | NR |
|
|
Larry Phone #: ###-####// needs historical, tempered glass, handrail clearance,, mechanical pass
|
BLD18-04507
| BLD-Final | 2/14/2020 | 2/19/2020 | 2/19/2020 12:59:23 PM | A | NR |
|
|
Call: PJ Smith on way to inspection. PJ Would like to walk through home with inspector, 208 559 0588
Have a great weekend!
PJ Phone #: ###-#### Inspection requested via web by PJ Smith
|
BLD18-04507
| BLD-Blower Door Test Results | 2/14/2020 | 2/19/2020 | 2/19/2020 12:59:11 PM | A | NR |
|
|
Call: PJ Smith on way to inspection. PJ Would like to walk through home with inspector, 208 559 0588
Have a great weekend!
PJ Phone #: ###-#### Inspection requested via web by PJ Smith
|
MIS20-00052
| BLD-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 12:52:47 PM | A | PEND |
|
|
sign mounted on carport without required engineering or planning approval // Brian McGowan Phone #: ###-####// owner is in process
|
BLD18-04371
| BLD-Final | 2/14/2020 | 2/19/2020 | 2/19/2020 12:52:10 PM | A | PART |
|
|
Charlie Phone #: ###-####// just needs smoke/carbon
|
BLD19-02146
| BLD-Other | 2/18/2020 | 2/19/2020 | 2/19/2020 12:43:42 PM | A | PASS |
|
|
Please call Robert before so he can meet you. ###-#### Phone #: ###-#### Inspection requested via web by Robert Bruno// soffit base layer of fire rated plywood ok
|
BLD20-00214
| BLD-Other | 2/18/2020 | 2/19/2020 | 2/19/2020 11:13:07 AM | A | DONE |
|
|
Inspection on a completed asphalt roofing project Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-00214
| DOC - Permit Finaled | 2/19/2020 | 2/19/2020 | 2/19/2020 11:12:58 AM | P | PASS |
|
|
done,, roofing will lay down with warmer weather per contractor
|
BLD19-03546
| BLD-Conference | 2/19/2020 | 2/19/2020 | 2/19/2020 10:53:35 AM | A | PART |
|
|
meet framer// framer is gone,, repairs not complete on the fire blocking at 3 areas,, can see at energy inspection,, ok to insulate
|