BLD18-00202
| BLD-Aging Inspection | 2/27/2019 | 2/27/2019 | 3/1/2019 3:28:22 PM | | PEND |
|
|
|
BLD18-03439
| BLD-Wall Bracing | 2/26/2019 | 2/27/2019 | 2/27/2019 5:39:05 PM | P | PASS |
|
|
Shear // Cara Phone #: ###-####
|
BLD16-04138
| BLD-Conference | 2/27/2019 | 2/27/2019 | 2/27/2019 4:07:52 PM | P | PASS |
|
|
call 30 mins ahead please- Keith Phone #: ###-####,, wants to use 2x4 stud wall as the divider wall,, ok
|
BLD18-04113
| BLD-Final | 2/27/2019 | 2/27/2019 | 2/27/2019 2:43:54 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD19-00256
| BLD-Final | 2/26/2019 | 2/27/2019 | 2/27/2019 2:14:21 PM | A | PART |
|
|
Mike-Phone #: ###-####,, ok pending change for records deleting interior walls
|
BLD18-03149
| BLD-Energy code compliance | 2/26/2019 | 2/27/2019 | 2/27/2019 2:12:36 PM | P | PART |
|
|
Brian Phone #: ###-####,, needs fireblocking at the double wall.. needs plates sealed up,, needs tempered glass at the final
|
BLD18-01646
| BLD-Framing/Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 1:19:44 PM | A | NR |
|
|
David Phone #: ###-####,, need truss bracing, shims on headers/plates, needs king studs nailed into headers in all plys, strap top plate ,, see paint
|
BLD15-00224
| BLD-Other | 2/25/2019 | 2/27/2019 | 2/27/2019 1:17:31 PM | A | FAIL |
|
|
Status?,, appears to occupied,, left a correction notice to have fire, building and zoning approvals, and a "do not occupy" red tag
|
BLD18-04292
| BLD-Final | 2/26/2019 | 2/27/2019 | 2/27/2019 1:14:21 PM | A | NR |
|
|
Garry Phone #: ###-####,, hand rail is too small,, (1/2")
|