MIS18-00175
| MIS-Aging Inspection | 2/6/2020 | 2/6/2020 | 2/7/2020 5:06:51 PM | | DONE |
|
|
|
MIS19-00097
| MIS-Aging Inspection | 2/6/2020 | 2/6/2020 | 2/7/2020 5:05:49 PM | | FAIL |
|
|
|
BLD19-02090
| BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/7/2020 11:30:10 AM | P | PASS |
|
|
Zach Phone #: ###-####,, ok to cover
|
BLD19-04459
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/7/2020 9:08:34 AM | P | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04714
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:34:49 PM | P | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04437
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:18:49 PM | A | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04714
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 3:18:21 PM | P | PASS |
|
|
done,, talked with the contractor about roof not laying down all the way but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04437
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 3:18:01 PM | P | PASS |
|
|
done,, talked with the contractor about roof not laying down all the way but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-03330
| BLD-Wall Bracing | 2/6/2020 | 2/6/2020 | 2/6/2020 3:06:21 PM | P | PART |
|
|
Phone #: ###-####,, exterior work in progress,, ok after re-doing including non-called out brace panels per APA requirements// will need interior bracing with drywall
|
BLD19-04423
| BLD-Final | 2/4/2020 | 2/6/2020 | 2/6/2020 3:04:16 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Danny Pardee,, needs electrical final
|
BLD19-04378
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:03:45 PM | A | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe//done,, talked with the contractor about roof not laying down all the way but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04721
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:03:16 PM | P | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe//done,, talked with the contractor about roof not laying down all the way but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04892
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:02:49 PM | P | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe// done,, talked with the contractor about roof not laying down all the way but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04892
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 3:02:10 PM | P | PASS |
|
|
|
BLD19-04463
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 3:01:33 PM | P | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-04463
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 3:01:25 PM | P | PASS |
|
|
done,, talked with the contractor about roof not laying down but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04378
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 2:24:32 PM | P | PASS |
|
|
done,, talked with the contractor about roof not laying down but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04721
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 2:23:52 PM | P | PASS |
|
|
done,, talked with the contractor about roof not laying down but they should lay down and seal when warmer weather starts,, they will warrenty if not
|
BLD19-04455
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 12:21:36 PM | A | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe// completed,, owner will call contractor if the roof does'nt lay down better
|
BLD19-04455
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 12:19:45 PM | P | PASS |
|
|
|
BLD19-04377
| BLD-Other | 2/4/2020 | 2/6/2020 | 2/6/2020 12:18:47 PM | A | DONE |
|
|
Inspection on a basic re-roof job that has since been completed. Phone #: ###-#### Inspection requested via web by Michael La Pointe//
|
BLD19-04377
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 12:18:36 PM | P | PASS |
|
|
TPO appears to be complete,, no access
|
MIS19-00095
| DOC - Permit Finaled | 2/6/2020 | 2/6/2020 | 2/6/2020 12:02:08 PM | P | PASS |
|
|
|
BLD19-04210
| BLD-Energy code compliance | 2/5/2020 | 2/6/2020 | 2/6/2020 11:45:48 AM | A | PASS |
|
|
Michael Phone #: ###-####
|
BLD19-04496
| BLD-Footing | 2/5/2020 | 2/6/2020 | 2/6/2020 11:12:04 AM | A | PASS |
|
|
Call prior to going Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD19-04535
| BLD-Footing | 2/3/2020 | 2/6/2020 | 2/6/2020 10:19:43 AM | A | PASS |
|
|
Dave; Phone #: ###-####
|
BLD19-02090
| BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 10:15:59 AM | A | PEND |
|
|
Zach Phone #: ###-####
|
BLD19-01828
| BLD-Wall cover | 2/5/2020 | 2/6/2020 | 2/6/2020 8:47:25 AM | P | CANC |
|
|
Ceiling penetration fire caulking 1st & 2nd floors approve for insulation. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD19-01828
| BLD-Energy code compliance | 2/5/2020 | 2/6/2020 | 2/6/2020 8:47:20 AM | P | CANC |
|
|
Exterior wall insulation and moisture barrier 1st & 2nd floors. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|