Inspections for the day of: Friday, April 26, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02746 BLD-Aging Inspection4/26/20194/26/20194/30/2019 3:02:46 PM PEND
BLD18-03441 BLD-Aging Inspection4/26/20194/26/20194/30/2019 3:02:26 PM PEND
BLD18-03496 BLD-Wall cover4/26/20194/26/20194/29/2019 9:31:24 AMPPART
Colby Phone #: ###-####,, upper firewall.. work in progress
BLD18-04220 BLD-Final4/26/20194/26/20194/29/2019 9:30:36 AMPNR
Mike Phone #: ###-####,, needs Blower door test,, fire caulking
BLD19-00202 BLD-Wall Bracing4/26/20194/26/20194/26/2019 3:56:30 PMPPART
shear // Zach Phone #: ###-####,, covered,, appears ok
BLD18-03495 BLD-Wall cover4/26/20194/26/20194/26/2019 3:56:06 PMPPART
Colby Phone #: ###-####,, 2nd floor,, work in progress
BLD18-03494 BLD-Wall cover4/26/20194/26/20194/26/2019 3:55:34 PMPPART
Colby Phone #: ###-####,, 2nd floor work in progress
BLD19-00927 BLD-Wall Bracing4/26/20194/26/20194/26/2019 3:05:18 PMPPASS
shear and framing // Trent Phone #: ###-####,, wall bracing ok,, needs trades for frame
BLD18-04248 BLD-Footing4/25/20194/26/20194/26/2019 1:59:23 PMPPART
Shawn-pour time2:00 Phone #: ###-####,, work in progress,, basement footings
BLD19-00322 BLD-Framing/Rough-in4/25/20194/26/20194/26/2019 12:04:07 PMAFAIL
Monica Phone #: ###-####,, correction posted,, needs.. truss engineering, strap beam to plate, point load studs under girder, toenails, fasten girder per engineering..
BLD18-04240 BLD-Foundation4/25/20194/26/20194/26/2019 11:41:41 AMAPART
Dustin-stem wall Phone #: ###-####,, work in progress,, missed layout on footings in some areas,, dowelled in and re-pour with wall ok
BLD19-01288 BLD-Conference4/25/20194/26/20194/26/2019 11:27:56 AMADEFR
contact John Hoyne ###-#### to arrange time to meet for inspection of previous fire damage.// Asbestos work going on,, will re call the inspection after abatement is complete
BLD18-01896 BLD-Final4/25/20194/26/20194/26/2019 11:25:24 AMAPASS
Charlie Phone #: ###-####,, set backs ok per historical
BLD18-01896 DOC - Permit Finaled4/26/20194/26/20194/26/2019 11:24:49 AMPPASS
Historical, T.V. said that the setbacks are ok as is,, existing?
BLD19-00850 BLD-Foundation4/25/20194/26/20194/26/2019 11:03:15 AMAPART
Ren Phone #: ###-####,, ICF walls,, work in progress
MIS18-00240 DOC - Permit Finaled4/26/20194/26/20194/26/2019 10:48:36 AMPPASS
MIS18-00237 DOC - Permit Finaled4/26/20194/26/20194/26/2019 10:48:03 AMPPASS
BLD18-03228 BLD-Blower Door Test Results4/25/20194/26/20194/26/2019 10:47:46 AMAPASS
Dennis Phone #: ###-####/// 3.5
BLD18-03228 BLD-Final4/25/20194/26/20194/26/2019 10:47:29 AMAPASS
Dennis Phone #: ###-####
BLD18-03228 DOC - Permit Finaled4/26/20194/26/20194/26/2019 10:47:09 AMPPASS