BLD19-02330
| BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 10:55:10 AM | | PEND |
|
|
|
BLD19-00361
| BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 10:53:16 AM | | PEND |
|
|
|
BLD19-02661
| BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 10:52:30 AM | | PASS |
|
|
|
BLD19-01905
| BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 10:52:04 AM | | PASS |
|
|
|
BLD18-03401
| BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 10:51:14 AM | | PEND |
|
|
|
BLD19-04851
| BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/30/2020 9:58:59 AM | P | NR |
|
|
Andy Phone #: ###-####
|
BLD19-01905
| BLD-Conference | 4/29/2020 | 4/29/2020 | 4/30/2020 6:43:24 AM | P | PASS |
|
|
job conf on final// still work in progress,, ok
|
BLD19-03737
| BLD-Conference | 4/29/2020 | 4/29/2020 | 4/29/2020 2:06:18 PM | P | PASS |
|
|
Walt Gann; Phone #: ###-####,, will use a commercial grade painted ok exterior cover
|
BLD20-00918
| BLD-Footing | 4/28/2020 | 4/29/2020 | 4/29/2020 1:05:15 PM | A | PASS |
|
|
As EARLY of an inspection as possible. We need to start building at 10:00am ....please.... thank you. Phone #: ###-#### Inspection requested via web by Candyce Moss// ok via photos
|
BLD19-04851
| BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 12:05:19 PM | A | NR |
|
|
Andy Phone #: ###-####,, needs electrical pass,, not on the schedule yet..
|
BLD19-01685
| BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 12:04:18 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson// walk through only,, needs P/W hillside pass,, mech pass on outdoor fireplace,, verify underfloor seal etc., exterior reveal on foundation from landscape, fire caulk
|
BLD19-02956
| BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 11:01:59 AM | A | PART |
|
|
Josiah Phone #: ###-####// conf walk through,, needs fire caulking, f/p pass,, ADU is on seperate permit,, needs handrail, guardrail including open risers, address posted
|