Inspections for the day of: Wednesday, May 20, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02471 BLD-Aging Inspection5/20/20205/20/20205/22/2020 2:34:07 PM PEND
BLD19-04002 BLD-Aging Inspection5/20/20205/20/20205/22/2020 2:32:57 PM DONE
BLD19-02461 BLD-Aging Inspection5/20/20205/20/20205/22/2020 2:32:32 PM PEND
BLD20-01435 BLD-Final5/20/20205/20/20205/20/2020 4:04:31 PMPDONE
Inspection on a completed asphalt re-roof project. We did not do the largest gable, only the southern half. The left if you''re looking at the building from the State St side. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01435 DOC - Permit Finaled5/20/20205/20/20205/20/2020 4:04:24 PMPPASS
BLD20-00756 BLD-Final5/20/20205/20/20205/20/2020 3:54:08 PMPPASS
The lock box is located on the metal railing at the front porch, the code is 3904.
The house is NOT occupied. Phone #: ###-#### Inspection requested via web by Joe Perdew
BLD20-00756 DOC - Permit Finaled5/20/20205/20/20205/20/2020 3:54:01 PMPPASS
BLD19-03320 BLD-Framing/Rough-in5/20/20205/20/20205/20/2020 3:53:39 PMPPASS
Please call Gary 30 minutes prior to inspection and I wiI’ll meet you there. Thanks! Phone #: ###-#### Inspection requested via web by Gary Gettman
BLD20-01579 BLD-Final5/20/20205/20/20205/20/2020 2:38:13 PMPPASS
Phone #: ###-####.. done .. gone
BLD20-01579 DOC - Permit Finaled5/20/20205/20/20205/20/2020 2:38:06 PMPPASS
BLD19-03446 BLD-Final5/19/20205/20/20205/20/2020 12:32:20 PMAPASS
Building Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD19-03446 DOC - Permit Finaled5/20/20205/20/20205/20/2020 12:29:02 PMPPASS
BLD19-03446 BLD-Blower Door Test Results5/20/20205/20/20205/20/2020 12:28:49 PMPPASS
Building Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//
3.0
BLD18-01649 BLD-Framing/Rough-in5/19/20205/20/20205/20/2020 12:06:30 PMAPASS
Bill *screened* Phone #: ###-####
BLD19-04845 BLD-Wall Bracing5/19/20205/20/20205/20/2020 11:33:22 AMAPASS
Mitch Phone #: ###-####
BLD20-01435 BLD-Other5/19/20205/20/20205/20/2020 11:14:44 AMADONE
Inspection on a completed asphalt re-roof project. We did not do the largest gable, only the southern half. The left if you''re looking at the building from the State St side. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01435 DOC - Permit Finaled5/20/20205/20/20205/20/2020 11:11:52 AMPPASS